An MILP model and solution technique for the planning of infrastructure in offshore oilfields

被引:39
作者
Carvalho, MCA
Pinto, JM [1 ]
机构
[1] Polytech Univ, Othmer Dept Chem & Biol Sci & Engn, Brooklyn, NY 11201 USA
[2] Univ Sao Paulo, Dept Chem Engn, BR-05508900 Sao Paulo, Brazil
关键词
oilfield exploration; mixed integer programming; planning model; decomposition methods; optimization;
D O I
10.1016/j.petrol.2005.11.012
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The objective of this paper is to propose an optimization model for the planning of infrastructure in offshore oilfields. The proposed model determines the existence of a given set of platforms and their potential connection with wells, as well as on the timing of extraction and production rates. The model includes discrete and continuous decisions along the project lifetime. Discrete variables represent the installation of platforms and wells in each period. Continuous variables are concerned with oil and gas production. Important features of this model are that the pressure in each reservoir is considered and affects extraction globally in the wells, as well as investment constraints. Based on these considerations, the model that represents the infrastructure is a Mixed Integer Programming (MIP) problem that maximizes the net present value that includes the revenues as well as the installation, drilling and connection costs. A disaggregation technique proposed by Iyer and Grossmann (Industrial and Engineering Chemistry Research, 37, 474-481, 1998) is applied to the model that is composed of assignment and planning subproblems. The master problem determines the assignment of platforms to wells and the planning subproblem calculates the timing for fixed assignments. With the decrease in the number of binary variables and with the application of the disaggregation technique, it becomes possible to solve problems of realistic dimension, although investment constraints still require mode efficient solution methods. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:97 / 110
页数:14
相关论文
共 12 条
[1]  
Brooke A., 1998, GAMS USERS GUIDE
[2]   A bilevel decomposition technique for the optimal planning of offshore platforms [J].
Carvalho, MCA ;
Pinto, JM .
BRAZILIAN JOURNAL OF CHEMICAL ENGINEERING, 2006, 23 (01) :67-82
[3]  
DEVINE MD, 1972, MANAGE SCI B-APPL, V18, pB378, DOI 10.1287/mnsc.18.8.B378
[4]  
FURTADO A, 1995, REV BRAS ENERG, V4, P93
[5]   A stochastic programming approach to planning of offshore gas field developments under uncertainty in reserves [J].
Goel, V ;
Grossmann, IE .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (08) :1409-1429
[6]  
*ILOG, 1999, ILOG CPLEX US MAN VE
[7]   A bilevel decomposition algorithm for long-range planning of process networks [J].
Iyer, RR ;
Grossmann, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (02) :474-481
[8]   Optimal planning and scheduling of offshore oil field infrastructure investment and operations [J].
Iyer, RR ;
Grossmann, IE ;
Vasantharajan, S ;
Cullick, AS .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (04) :1380-1397
[9]   Mixed-integer multiperiod model for the planning of oilfield production [J].
Ortíz-Gómez, A ;
Rico-Ramirez, V ;
Hernández-Castro, S .
COMPUTERS & CHEMICAL ENGINEERING, 2002, 26 (4-5) :703-714
[10]  
Tsarbopoulou C., 2000, THESIS U COLL LONDON