Start-up performance of a woodchip bioreactor operated end-of-pipe at a commercial fish farm-A case study

被引:22
作者
von Ahnen, Mathis [1 ]
Pedersen, Per Bovbjerg [1 ]
Dalsgaard, Johanne [1 ]
机构
[1] Tech Univ Denmark, DTU Aqua, Aquaculture Sect, North Sea Res Ctr, POB 101, DK-9850 Hirtshals, Denmark
关键词
Nitrogen; Denitrification; End-of-pipe treatment; Field study; OPTIMIZING NITRATE REMOVAL; DENITRIFICATION; RATES; MEDIA; BARRIERS;
D O I
10.1016/j.aquaeng.2016.07.002
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
There is a need for simple, maintenance-free technologies for removing nitrogen (N) from aquaculture effluents. Denitrifying woodchip bioreactors have been used successfully to remove nitrate-N (NO3-N) from ground and surface waters and may potentially be applied to dilute aquaculture effluents as well. Real-life applicability in commercial, outdoor fish farms including practical start-up issues such as e.g. time till stable performance and potential leaching are, however, unknown to the industry. This case study consequently investigated the temporal performance of a woodchip bioreactor (12.5 m(3)) during start-up. The bioreactor was operated end-of-pipe at a commercial, outdoor rainbow trout (Oncorhynchus mykiss) farm in Denmark operated at low recirculation intensity. Applying an empty bed contact time (EBCT) of 5 h, the specific objectives of the study were to resolve: i) how fast the bioreactor would start to remove NO3-N; ii) how fast steady state was achieved; iii) which NO3-N removal rates could be attained at the relatively low effluent temperature (similar to 8 degrees C) and iv) to which extent any concomitant leaching of phosphorous (P), ammonia or organic matter would occur. In- and outlet grab samples were obtained every 6 h until the bioreactor was in steady state (2 weeks) followed by weekly 24 h pooled samples for another 3 weeks (5 weeks in total). Additional grab samples were obtained from 9 sampling ports within the bioreactor on 3 consecutive days during steady state. Samples were analyzed for dissolved nutrients (total N, nitrate, nitrite, ammonium, total phosphorous, ortho-phosphorous, BOD5 and COD). In addition, oxygen, temperature and pH were logged every 30 min while sampling and alkalinity were measured once a week. Removal of NO3-N started immediately and remained stable at 7.06 +/- 0.81 g NO3-N/m(3)/d (n = 6) throughout the sampling period. Increased effluent NO2-N concentrations (peaking at 1.14 mg NO2-N/I after 4-5 days) were transiently observed during the initial 11 days. After that, the woodchip bioreactor was largely in steady state with respect to N-balances corroborated by a close match between filtered total-N (TNdiss) and NO3-N removal rates. Measurements within the bed showed that the majority of the influent dissolved oxygen (DO) was consumed within the first part of the bioreactor and that NO3-N removal thereafter proceeded gradually with distance within the bed. Leaching of non-structural, dissolved organic compounds were observed just after startup, causing a short-term (1 week) increase in effluent concentrations of COD, BOD5, P and ammonium. Additional measurements carried out until 147 days after start-up showed that the woodchip bioreactor continued to remove TNdiss at an average removal rate of 7.81 +/- 0.82 g N/m(3)/d, and that the initial leakage of P stopped altogether. In summary, the study demonstrated that woodchip bioreactors can effectively remove NO3-N from dilute aquacultural effluents at low temperatures and commercial conditions and that stable performance is achieved within a few weeks. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:96 / 104
页数:9
相关论文
共 42 条
  • [21] ISO, 2002, ISO 15705:2002 Water Quality-Determination of the Chemical Oxygen Demand Index (ST-COD)-Small-Scale Sealed-Tube Method
  • [22] Lepine C., 2015, J ENV QUAL
  • [23] Metcalf I.N. C., 2003, WASTEWATER ENG TREAT
  • [24] Acetate limitation and nitrite accumulation during denitrification
    Oh, J
    Silverstein, J
    [J]. JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1999, 125 (03): : 234 - 242
  • [25] Nitrate removal rates in a 15-year-old permeable reactive barrier treating septic system nitrate
    Robertson, W. D.
    Vogan, J. L.
    Lombardo, P. S.
    [J]. GROUND WATER MONITORING AND REMEDIATION, 2008, 28 (03) : 65 - 72
  • [26] Nitrate removal rates in woodchip media of varying age
    Robertson, W. D.
    [J]. ECOLOGICAL ENGINEERING, 2010, 36 (11) : 1581 - 1587
  • [27] Rates of Nitrate and Perchlorate Removal in a 5-Year-Old Wood Particle Reactor Treating Agricultural Drainage
    Robertson, W. D.
    Ptacek, C. J.
    Brown, S. J.
    [J]. GROUND WATER MONITORING AND REMEDIATION, 2009, 29 (02) : 87 - 94
  • [28] In-Stream Bioreactor for Agricultural Nitrate Treatment
    Robertson, W. D.
    Merkley, L. C.
    [J]. JOURNAL OF ENVIRONMENTAL QUALITY, 2009, 38 (01) : 230 - 237
  • [29] IN-SITU DENITRIFICATION OF SEPTIC-SYSTEM NITRATE USING REACTIVE POROUS-MEDIA BARRIERS - FIELD TRIALS
    ROBERTSON, WD
    CHERRY, JA
    [J]. GROUND WATER, 1995, 33 (01) : 99 - 111
  • [30] Long-term performance of in situ reactive barriers for nitrate remediation
    Robertson, WD
    Blowes, DW
    Ptacek, CJ
    Cherry, JA
    [J]. GROUND WATER, 2000, 38 (05) : 689 - 695