A system dynamics model for the supply chain procurement transport problem: comparing spreadsheets, fuzzy programming and simulation approaches

被引:28
作者
Mula, Josefa [1 ]
Campuzano-Bolarin, Francisco [2 ]
Diaz-Madronero, Manuel [1 ]
Carpio, Katerine M. [1 ]
机构
[1] Univ Politecn Valencia, CIGIP Res Ctr Prod Management & Engn, Alcoy 03801, Spain
[2] Univ Politecn Cartagena UPCT, Dept Business Management, Cartagena 30202, Spain
关键词
simulation; system dynamics; supply chain dynamics; procurement; transport; operations planning; AGENT-BASED SIMULATION; FRAMEWORK; PRODUCTS; SUPPORT; DESIGN;
D O I
10.1080/00207543.2013.774487
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article proposes a simulation approach based on system dynamics for operational procurement and transport planning in a two-level, multi-product and multi-period supply chain. This work uses the Vensim((R)) simulation tool to highlight the potential of system dynamics for supply chain simulation. A real continuous simulation application is presented in an automobile supply chain. The effectiveness of the proposed model is validated through the comparison of the results provided by spreadsheet-based simulation, fuzzy multi-objective programming and system dynamics-based simulation models. The fundamental point of this paper is that the simulation model is the most effective approach in quantifying the trade-off between number of truck shipments and average inventory level. In this case, the number of truck shipments is to be minimised, resulting in a higher inventory level. If the average inventory level were minimised, then there would be more truck shipments. Here, it is shown the benefit of this type of simulation model in reducing inventory by about 10%.
引用
收藏
页码:4087 / 4104
页数:18
相关论文
共 64 条
[31]   The internal bullwhip effect in car manufacturing [J].
Klug, Florian .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (01) :303-322
[32]   A NEW APPROACH TO SOME POSSIBILISTIC LINEAR-PROGRAMMING PROBLEMS [J].
LAI, YJ ;
HWANG, CL .
FUZZY SETS AND SYSTEMS, 1992, 49 (02) :121-133
[33]   Production-distribution planning in supply chain considering capacity constraints [J].
Lee, YH ;
Kim, SH .
COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 43 (1-2) :169-190
[34]   Production-distribution planning in supply chain using a hybrid approach [J].
Lee, YH ;
Kim, SH ;
Moon, C .
PRODUCTION PLANNING & CONTROL, 2002, 13 (01) :35-46
[35]   Distribution planning decisions using interactive fuzzy multi-objective linear programming [J].
Liang, TF .
FUZZY SETS AND SYSTEMS, 2006, 157 (10) :1303-1316
[36]   Hybrid approach to distribution planning reflecting a stochastic supply chain [J].
Lim, SJ ;
Jeong, SJ ;
Kim, KS ;
Park, MW .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 28 (5-6) :618-625
[37]   A simulation approach for production-distribution planning with consideration given to replenishment policies [J].
Lim, SJ ;
Jeong, SJ ;
Kim, KS ;
Park, MW .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 27 (5-6) :593-603
[38]   Planning and scheduling of parallel semicontinuous processes .1. Production planning [J].
McDonald, CM ;
Karimi, IA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1997, 36 (07) :2691-2700
[39]   Dependence of lead time on batch size studied by a system dynamics model [J].
Mikati, Nabil .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (18) :5523-5532
[40]   Supply chain modeling: past, present and future [J].
Min, H ;
Zhou, GG .
COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 43 (1-2) :231-249