A hybrid Tabu sample-sort simulated annealing approach for solving distributed scheduling problem

被引:27
|
作者
Chan, Felix T. S. [1 ]
Prakash, Anuj [1 ]
Ma, H. L. [1 ]
Wong, C. S. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
Tabu-search; sample sort simulated annealing (SSA); distributed scheduling; makespan; FLEXIBLE MANUFACTURING SYSTEMS; GENETIC ALGORITHM; OPTIMIZATION; SEARCH;
D O I
10.1080/00207543.2012.737948
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The distributed scheduling problem has been considered as the allocation of a task to various machines in such a way that these machines are situated in different factories and these factories are geographically distributed. Therefore distributed scheduling has fulfilled various objectives, such as allocation of task to the factories and machines in such a manner that it can utilise the maximum resources. The objective of this paper is to minimise the makespan in each factory by considering the transportation time between the factories. In this paper, to address such a problem of scheduling in distributed manufacturing environment, a novel algorithm has been developed. The proposed algorithm gleans the ideas both from Tabu search and sample sort simulated annealing. A new algorithm known as hybrid Tabu sample-sort simulated annealing (HTSSA) has been developed and it has been tested on the numerical example. To reveal the supremacy of the proposed algorithm over simple SSA and Tabu search, more computational experiments have also been performed on 10 randomly generated datasets.
引用
收藏
页码:2602 / 2619
页数:18
相关论文
共 50 条
  • [1] Sample-sort simulated annealing
    Thompson, DR
    Bilbro, GL
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2005, 35 (03): : 625 - 632
  • [2] Fuzzy-based adaptive sample-sort simulated annealing for resource-constrained project scheduling
    Shukla, Sanjay Kumar
    Son, Young Jun
    Tiwari, M. K.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (9-10): : 982 - 995
  • [3] Fuzzy-based adaptive sample-sort simulated annealing for resource-constrained project scheduling
    Shukla, Sanjay Kumar
    Son, Young Jun
    Tiwari, M.K.
    International Journal of Advanced Manufacturing Technology, 2008, 36 (9-10): : 982 - 995
  • [4] Fuzzy-based adaptive sample-sort simulated annealing for resource-constrained project scheduling
    Sanjay Kumar Shukla
    Young Jun Son
    M. K. Tiwari
    The International Journal of Advanced Manufacturing Technology, 2008, 36 : 982 - 995
  • [5] Jointly solving the group scheduling and machining speed selection problems: a hybrid tabu search and simulated annealing approach
    Zolfaghari, S
    Liang, M
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (10) : 2377 - 2397
  • [6] A simulated annealing metaheuristic approach to hybrid flow shop scheduling problem
    Hajji, Mohamed Karim
    Hamlaoui, Oumayma
    Hadda, Hatem
    ADVANCES IN INDUSTRIAL AND MANUFACTURING ENGINEERING, 2024, 9
  • [7] Solving the Course Scheduling Problem Using Simulated Annealing
    Aycan, E.
    Ayav, T.
    2009 IEEE INTERNATIONAL ADVANCE COMPUTING CONFERENCE, VOLS 1-3, 2009, : 462 - 466
  • [8] Solving the flowshop scheduling problem using simulated annealing
    Yang, G. (yanggelan@126.com), 1600, Advanced Institute of Convergence Information Technology, Myoungbo Bldg 3F,, Bumin-dong 1-ga, Seo-gu, Busan, 602-816, Korea, Republic of (04):
  • [9] A Distributed Approach to Solving Hybrid Flow-shop Scheduling Problem
    Zou Feng-xing
    Zeng Ling-li
    Gao Zheng
    Liu Feng
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2457 - 2461
  • [10] Applying a hybrid simulated annealing and tabu search approach to non-permutation flowshop scheduling problems
    Lin, S. -W.
    Ying, K. -C.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (05) : 1411 - 1424