Beam emittance control by changing injection painting area in a pulse-to-pulse mode in the 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex

被引:6
作者
Saha, P. K. [1 ]
Harada, H. [1 ]
Hayashi, N. [1 ]
Horino, K. [1 ]
Hotchi, H. [1 ]
Kinsho, M. [1 ]
Takayanagi, T. [1 ]
Tani, N. [1 ]
Togashi, T. [1 ]
Ueno, T. [1 ]
Yamazaki, Y. [1 ]
Irie, Y. [2 ]
机构
[1] JAEA, Tokai Naka, Ibaraki 3191195, Japan
[2] High Energy Accelerator Res Org KEK, Tsukuba, Ibaraki 3050801, Japan
关键词
D O I
10.1103/PhysRevSTAB.16.120102
中图分类号
O57 [原子核物理学、高能物理学];
学科分类号
070202 ;
摘要
The 3-GeV rapid cycling synchrotron (RCS) of Japan Proton Accelerator Research Complex (J-PARC) simultaneously delivers high intensity beam to the Material and Life Science Experimental Facility (MLF) as well as to the main ring (MR) at a repetition rate of 25 Hz. The RCS is designed for a beam power of 1 MW. RCS has to meet not only the need of power upgrade but also the specific requirement of each downstream facility. One of the issues, especially for high intensity operation, is to maintain two different transverse sizes of the extracted beam for MLF and MR; namely, a wider beam for MLF in order to reduce damage on the neutron production target but reversely a narrower one for the MR in order to ensure a permissible beam loss in the beam transport line of 3-GeV to MR and also in the MR. We proposed pulse-to-pulse direct control of the transverse painting area during the RCS beam injection process in order to get an extracted beam profile as desired. In addition to two existing dc septum magnets used for fixing injected beam trajectory for MLF beam, two additional dipoles named pulse steering magnets are designed for that purpose in order to control injected beam trajectory for a smaller painting area for the MR. The magnets are already installed in the injection beam transport line and successfully commissioned well in advance before they will be put in normal operation in 2014 for the 400 MeV injected beam energy upgraded from that of the present 181 MeV. Their parameters are found to be consistent to those expected in the corresponding numerical simulations. A trial one cycle user operation run for a painting area of 100 pi mm mrad for the MR switching from the MLF painting area of 150 pi mm mrad has also been successfully carried out. The extracted beam profile for the MR is measured to be sufficiently narrower as compared to that for the MLF, consistent with numerical simulation successfully demonstrating validity of the present principle.
引用
收藏
页数:11
相关论文
共 17 条
[1]  
Hayashi N., 2013, P 2013 INT PART ACC, P3833
[2]  
High-intensity Proton Accelerator Project Team, 2003044 JAERI HIGH I
[3]  
Holmes J. A., 2010, P 1 INT PART ACC C K, P1901
[4]   Beam loss reduction by injection painting in the 3-GeV rapid cycling synchrotron of the Japan Proton Accelerator Research Complex [J].
Hotchi, H. ;
Harada, H. ;
Hayashi, N. ;
Kinsho, M. ;
Saha, P. K. ;
Shobuda, Y. ;
Tamura, F. ;
Yamamoto, K. ;
Yamamoto, M. ;
Yoshimoto, M. ;
Irie, Y. .
PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2012, 15 (04)
[5]  
Hotchi H., 2012, P 52 ICFA ADV BEAM D, P68
[6]  
Hotchi H., 2013, P 1 INT PART ACC C I, P3836
[7]   Beam commissioning and operation of the Japan Proton Accelerator Research Complex 3-GeV rapid cycling synchrotron [J].
Hotchi, Hideaki ;
Harada, Hiroyuki ;
Hayashi, Naoki ;
Kinsho, Michikazu ;
Saha, Pranab ;
Shobuda, Yoshihiro ;
Tamura, Fumihiko ;
Yamamoto, Kazami ;
Yamamoto, Masanobu ;
Yoshimoto, Masahiro ;
Kato, Shinichi ;
Irie, Yoshiro ;
Koseki, Tadashi ;
Sato, Yoichi ;
Satou, Kenichiro ;
Shirakata, Masashi .
PROGRESS OF THEORETICAL AND EXPERIMENTAL PHYSICS, 2012, 2012 (01)
[8]  
Kamiya J., 2013, P 2013 INT PART ACC, P3327
[9]   Localization of the large-angle foil-scattering beam loss caused by the multiturn charge-exchange injection [J].
Kato, Shinichi ;
Yamamoto, Kazami ;
Yoshimoto, Masahiro ;
Harada, Hiroyuki ;
Kinsho, Michikazu .
PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2013, 16 (07)
[10]  
Kinsho M., 2013, PROC IPAC, P3848