Two-stage Optimization of Load Restoration Considering Integration of Wind Power

被引:0
作者
Qiu, Chenguang [1 ]
Cheng, Jinmin [1 ]
Liu, Zhihang [2 ]
Gao, Yunbo [2 ]
Zang, Haixiang [2 ]
机构
[1] State Grid Jiangsu Elect Power Co Ltd, Dispatching & Control Ctr, Nanjing 210024, Jiangsu, Peoples R China
[2] Hohai Univ, Coll Energy & Elect Engn, Nanjing 211100, Jiangsu, Peoples R China
来源
PROCEEDINGS OF THE 2018 13TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2018) | 2018年
关键词
load restoration; wind farm; two-stage optimization; 0-1; programming; optimal power flow; primal-dual interior point method;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Large scale wind power integration will bring a certain impact on the orderly recovery of power grid and adopting an appropriate recovery strategy could be contributed to restore power supply safely and quickly. Load restoration is a complex multi-time-step mixed-integer nonlinear optimization (MINLP) problem, so it's usually difficult to solve directly. In order to reduce the difficulty of solving problem, a two-stage optimization model of load restoration considering integration of wind power is proposed. The load restoration problem is decoupled in stages, a 0-1 programming of load restoration is established with weighted wind power and maximum load restoration as the goal to obtain wind power and load input schemes. Based on this, we construct a nonlinear programming model based on AC power flow and use primal-dual interior point method (PDIPM) to obtain the optimal outputs of unit and the shortest recovery time, to a certain extent, the cross boundary of the system will be eliminated at the same time. Validity of the model is verified with simulation of modified IEEE 30-bus system and the model proposed in this paper can obtain an effective restoration scheme and reduce the difficulty of direct solution. Moreover, the impact of load restoration considering integration of wind power is analyzed in detail.
引用
收藏
页码:2642 / 2647
页数:6
相关论文
共 14 条
[1]  
[陈彬 Chen Bin], 2016, [电力系统自动化, Automation of Electric Power Systems], V40, P6
[2]  
[陈小平 Chen Xiaoping], 2009, [电工技术学报, Transactions of China Electrotechnical Society], V24, P171
[3]  
Cheng Gaihong, 2007, Automation of Electric Power Systems, V31, P62
[4]   FROM GENERIC RESTORATION ACTIONS TO SPECIFIC RESTORATION STRATEGIES [J].
FINK, LH ;
LIOU, KL ;
LIU, CC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (02) :745-751
[5]  
Gu Xueping, 2015, Electric Power Automation Equipment, V35, P6, DOI 10.16081/j.issn.1006-6047.2015.09.002
[6]  
[廖诗武 Liao Shiwu], 2016, [中国电机工程学报, Proceedings of the Chinese Society of Electrical Engineering], V36, P4873
[7]   A restoration strategy for a local power system considering critical load pickup [J].
Wen, F. (fushuan.wen@gmail.com), 1600, Automation of Electric Power Systems Press (37) :31-37
[8]  
Qu Hanbing, 2011, Automation of Electric Power Systems, V35, P16
[9]  
[宋坤隆 Song Kunlong], 2017, [电力系统自动化, Automation of Electric Power Systems], V41, P113
[10]  
Tang Yong, 2012, Proceedings of the CSEE, V32, P167