Reasearch on Single Critical Resource-Constrained Multiple Projects Scheduling Problem Based on Critical Chain Method

被引:0
|
作者
Hu Xin-bu [1 ]
Zhao Fen-ni [1 ]
机构
[1] Engn Coll Armied Police Forces, Xian 710086, Peoples R China
关键词
Critical Chain Method; Single Critical Resource; Multiple Projects; Scheduling optimize; Buffer;
D O I
10.4028/www.scientific.net/AMM.174-177.2975
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In view of the characteristic of the Single Critical Resource-Constrained Multiple Projects Scheduling Problem, the paper first describes the SCRCMPSP, then establishes the model upon SCRCMPSP based on the Critical Chain Method and designs the corresponding arithmetic, at the same time it puts forward an Arithmetic flow for the Problem. In order to verify degree of adaptability of model and calculate way, the thesis selects a real examinations form the engineering in the related cultural heritage to carry on solving and analyses, it prove the model and calculate way's opposite to the traditional item progress' method is more valid.
引用
收藏
页码:2975 / 2978
页数:4
相关论文
共 50 条
  • [21] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [22] Workflow-based resource-constrained project scheduling problem
    Li, Weiping
    Fan, Yushun
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2004, 44 (10): : 1384 - 1388
  • [23] HEURISTICS FOR SCHEDULING RESOURCE-CONSTRAINED PROJECTS IN MPM NETWORKS
    ZHAN, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 76 (01) : 192 - 205
  • [24] Heuristic scheduling of resource-constrained projects with cash flows
    Padman, R
    SmithDaniels, DE
    SmithDaniels, VL
    NAVAL RESEARCH LOGISTICS, 1997, 44 (04) : 365 - 381
  • [25] Multimode resource-constrained project scheduling in flexible projects
    Zsolt T. Kosztyán
    István Szalkai
    Journal of Global Optimization, 2020, 76 : 211 - 241
  • [26] A scheduling procedure for a general class of resource-constrained projects
    Sung, CS
    Lim, SK
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (01) : 9 - 17
  • [27] Scheduling resource-constrained projects with a flexible project structure
    Kellenbrink, Carolin
    Helber, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) : 379 - 391
  • [28] Heuristic scheduling of resource-constrained, multiplemode and repetitive projects
    Zhang, Hong
    Li, Heng
    Tam, C. M.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (02) : 159 - 169
  • [29] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [30] Approximate solution of a resource-constrained scheduling problem
    Sirdey, Renaud
    Carlier, Jacques
    Nace, Dritan
    JOURNAL OF HEURISTICS, 2009, 15 (01) : 1 - 17