Multi-objective colonial competitive algorithm for hybrid flowshop problem

被引:15
|
作者
Karimi, N. [1 ]
Davoudpour, H. [1 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn & Management Syst, 424 Hafez Ave, Tehran 1591634311, Iran
关键词
Colonial competition algorithm; Multi-objective; Hybrid flowshops; Pareto optimal solutions; Variable neighborhood search (VNS); SHOP SCHEDULING PROBLEM; GENETIC ALGORITHM; HEURISTICS; RULES; LINE;
D O I
10.1016/j.asoc.2016.06.034
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This study analyses the multi-objective optimization in hybrid flowshop problem, in which two conflicting objectives, makespan and total weighted tardiness, are considered to be minimized simultaneously. The multi-objective version of Colonial Competitive Algorithm (CCA) for real world optimization problem is introduced and investigated. In contrast to multi-objective problems solved by CCA, presented in the literature, which used the combination of the objectives as single objective, the proposed algorithm is established on Pareto solutions concepts. Another novelty of this paper is estimating the power of each imperialist by a probabilistic criterion for this multi objective algorithm. Besides that, the variable neighborhood search is implemented as an assimilation strategy. Performance of the algorithm is finally compared with a famous algorithm for scheduling problem, NSGA-II, and the multi-objective form of CCA [28]. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:725 / 733
页数:9
相关论文
共 50 条
  • [1] A multi-objective migrating birds optimization algorithm for the hybrid flowshop rescheduling problem
    Biao Zhang
    Quan-ke Pan
    Liang Gao
    Xin-li Zhang
    Kun-kun Peng
    Soft Computing, 2019, 23 : 8101 - 8129
  • [2] A multi-objective migrating birds optimization algorithm for the hybrid flowshop rescheduling problem
    Zhang, Biao
    Pan, Quan-ke
    Gao, Liang
    Zhang, Xin-li
    Peng, Kun-kun
    SOFT COMPUTING, 2019, 23 (17) : 8101 - 8129
  • [3] A multi-objective evolutionary algorithm for the hybrid flowshop rescheduling problem with lot streaming
    Zhang, Biao
    Meng, Leilei
    Zhang, Xinli
    PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 5163 - 5168
  • [4] Automatic algorithm design for multi-objective hybrid flowshop scheduling problem with variable sublots
    Zhang B.
    Meng L.
    Sang H.
    Lu C.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (11): : 3403 - 3420
  • [5] An automatic multi-objective evolutionary algorithm for the hybrid flowshop scheduling problem with consistent sublots
    Zhang, Biao
    Pan, Quan-ke
    Meng, Lei-lei
    Lu, Chao
    Mou, Jian-hui
    Li, Jun-qing
    KNOWLEDGE-BASED SYSTEMS, 2022, 238
  • [6] A multi-objective electromagnetism algorithm for a bi-objective hybrid no-wait flowshop scheduling problem
    Khalili, Majid
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (9-12): : 1591 - 1601
  • [7] A multi-objective electromagnetism algorithm for a bi-objective hybrid no-wait flowshop scheduling problem
    Majid Khalili
    The International Journal of Advanced Manufacturing Technology, 2014, 70 : 1591 - 1601
  • [8] MOEA/D for Multi-objective Hybrid Flowshop Rescheduling Problem
    Zhang, Biao
    Pan, Quan-ke
    Gao, Liang
    Zhao, Yao-bang
    PROCEEDINGS OF THE ASME 13TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2018, VOL 4, 2018,
  • [9] A multi-objective electromagnetism algorithm for a bi-objective flowshop scheduling problem
    Khalili, Majid
    Tavakkoli-Moghaddam, Reza
    JOURNAL OF MANUFACTURING SYSTEMS, 2012, 31 (02) : 232 - 239
  • [10] An improved multi-objective firefly algorithm for energy-efficient hybrid flowshop rescheduling problem
    Wang, Ziyue
    Shen, Liangshan
    Li, Xinyu
    Gao, Liang
    JOURNAL OF CLEANER PRODUCTION, 2023, 385