Systematic literature review of integrated project scheduling and material ordering problem: Formulations and solution methods

被引:11
作者
Afra, Ali Parchami [1 ]
Kheirkhah, Amirsaman [1 ]
Ahadi, Hamidreza [2 ]
机构
[1] Bu Ali Sina Univ, Engn Fac, Hamadan, Iran
[2] Iran Univ Sci & Technol, Sch Railway Engn, Tehran, Iran
关键词
Project scheduling; Material ordering planning; Systematic literature review; Procurement management; Resource investment problem; Resource leveling problem; MATERIAL PROCUREMENT; SUPPLIER SELECTION; GENETIC ALGORITHM; MODEL; CLASSIFICATION; EXTENSIONS; VARIANTS; DURATION; ROBUST;
D O I
10.1016/j.cie.2022.108711
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Project cost performance and resource availability can be improved by integrating project scheduling and material ordering. Integrating project scheduling and material ordering can achieve an optimal total cost due to trade-offs among project cost elements such as material purchase costs, availability of renewable resources, and ordering and holding material. Several studies in the project scheduling literature have addressed project scheduling and material ordering problems with varying assumptions and characteristics and have formulated these problems using mathematical models. This paper reviews studies that modeled and solved these integrated problems using a systematic literature review approach. The systematic literature review seeks to provide evidence to answer research-specific questions such as 1) Under what assumptions and conditions have the integrated project scheduling and material ordering problems been studied? 2) How are these problems formulated, and what mathematical models are proposed? 3) What methods are used to solve the mathematical models? 28 articles were eventually chosen during the search process steps. The selected articles were reviewed and presented using a classification scheme that consists of five aspects: project scheduling problem type, material ordering aspects, uncertainty conditions, objective function, and solution method. The mainstream of research in this scope is identified based on the article review results; thus, future research fields can be identified. This paper provides authors who want to research in this area with insights into the formulation of problems and solution methods, as well as information from previous articles.
引用
收藏
页数:14
相关论文
共 63 条
[1]   Multi-skilling in scheduling problems: A review on models, methods and applications [J].
Afshar-Nadjafi, Behrouz .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 151
[2]   The single item uncapacitated lot-sizing problem with time-dependent batch sizes: NP-hard and polynomial cases [J].
Akbalik, Ayse ;
Rapine, Christophe .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 229 (02) :353-363
[3]   Integration of multi-mode resource-constrained project scheduling under bonus-penalty policies with material ordering under quantity discount scheme for minimizing project cost [J].
Akhbari, M. .
SCIENTIA IRANICA, 2022, 29 (01) :427-446
[4]   The multi resource leveling and materials procurement problem: an integrated approach [J].
Almatroushi, Hessa ;
Hariga, Moncer ;
As'ad, Rami ;
Al-Bar, AbdulRahman .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (09) :2135-2161
[5]  
Aquilano N.J., 1980, Journal of Operations Management, V1, P57, DOI [10.1016/0272-6963(80)90013-3, DOI 10.1016/0272-6963(80)90013-3]
[6]   Resource constrained project scheduling and material ordering problem with discounted cash flows [J].
Asadujjaman, Md ;
Rahman, Humyun Fuad ;
Chakrabortty, Ripon K. ;
Ryan, Michael J. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
[7]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[8]   On being 'systematic' in literature reviews in IS [J].
Boell, Sebastian K. ;
Cecez-Kecmanovic, Dubravka .
JOURNAL OF INFORMATION TECHNOLOGY, 2015, 30 (02) :161-173
[9]  
Caron F., 1998, INT J PROJ MANAG, V16, P311, DOI [10.1016/S0263-7863(97)00029-X, DOI 10.1016/S0263-7863(97)00029-X]
[10]   Coordinating supplier selection and project scheduling in resource-constrained construction supply chains [J].
Chen, Weiwei ;
Lei, Lei ;
Wang, Zhengwei ;
Teng, Mingfei ;
Liu, Junming .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (19) :6512-6526