SUSTAINABLE GREEN CONSTRUCTION MANAGEMENT: SCHEDULE PERFORMANCE AND IMPROVEMENT

被引:10
作者
Hwang, Bon-Gang [1 ]
Leong, Lay Peng [2 ]
Huh, Young-Ki [3 ]
机构
[1] Natl Univ Singapore, Sch Design & Environm, Singapore 157766, Singapore
[2] EC Harris Singapore Pte Ltd, Cost Control, Singapore 089315, Singapore
[3] Pusan Natl Univ, Sch Architecture, Pusan 609735, South Korea
关键词
green building; construction; schedule; performance; sustainability; Singapore; PROJECT; IMPACT;
D O I
10.3846/20294913.2013.869669
中图分类号
F [经济];
学科分类号
02 ;
摘要
Over the last few years, the green building movement in Singapore has leaped bountifully. While environmental sustainability for greener construction has been emphasized, rare research has been conducted to analyze performance of green construction projects. As a result, this study aims to address schedule performance of green building construction projects and to provide some recommendations that may improve the targeted performance. To achieve this objective, a questionnaire was developed and the responses from 30 companies were analysed, and interviews with 6 project managers were conducted to further supplement and substantiate the survey results. The analysis reported that green building projects required an average of 8% more time than traditional building projects of similar size and characteristics. In addition, on average, these projects were delayed by 4.8% when compared with their as-planned schedules. Lastly, a list of recommendations was also introduced, aiming to ameliorate the schedule performance. This study will offer a benchmark for the industry to gauge the overall duration and performance of green building construction projects.
引用
收藏
页码:S43 / S57
页数:15
相关论文
共 40 条
[1]   The significant factors causing delay of building construction projects in Malaysia [J].
Alaghbari, Wa'el ;
Kadir, Mohd. Razali A. ;
Salim, Azizah ;
Ernawati .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) :192-+
[2]  
[Anonymous], 2004, GUID PROJ MAN BOD KN
[3]  
[Anonymous], BUSINESS TIMES
[4]   CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS [J].
ASSAF, SA ;
ALKHALIL, M ;
ALHAZMI, M .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) :45-50
[5]  
BCA, 2008, COD ENV SUST BUILD V
[6]   Examining the business impact of owner commitment to sustainability [J].
Beheiry, SMA ;
Chong, WK ;
Haas, CT .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (04) :384-392
[7]  
Building and Construction Authority (BCA), 2010, BCA CLINCH PREST AW
[8]  
Building and Construction Authority (BCA), 2009, 2 GREEN BUILD MAST
[9]   An evaluation of construction time performance in the building industry [J].
Chan, DWM ;
Kumaraswamy, MM .
BUILDING AND ENVIRONMENT, 1996, 31 (06) :569-578
[10]  
Choi C., 2009, Journal of Sustainable Real Estate, V1, P107, DOI DOI 10.1080/10835547.2009.12091785