An economic manufacturing quantity model for a two-stage assembly system with imperfect processes and variable production rate

被引:26
作者
Chang, Horng-Jinh [2 ]
Su, Rung-Hung [3 ]
Yang, Chih-Te [1 ]
Weng, Ming-Wei [4 ]
机构
[1] Ching Yun Univ, Dept Ind Management, Tao Yuan, Taiwan
[2] Tamkang Univ, Grad Inst Management Sci, Tamsui, New Taipei, Taiwan
[3] Yuan Ze Univ, Gerontechnol Res Ctr, Tao Yuan, Taiwan
[4] Feng Chia Univ, Ctr Business Educ Innovat, Taichung 40724, Taiwan
关键词
Inventory; Completely backlogged; Two-stage assembly system; Variable assembly rate; STAGE PRODUCTION SYSTEM; MULTISTAGE PRODUCTION SYSTEM; PRODUCTION-INVENTORY SYSTEMS; LOT-SIZE MODEL; REWORK PROCESS; BATCH SIZE; DEMAND; POLICIES;
D O I
10.1016/j.cie.2012.02.011
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This article considers a two-stage assembly system with imperfect processes. The former is an automatic stage in which the required components are manufactured. The latter is a manual stage which deals with taking the components to assemble the end product. In addition, the component processes are independent of each other, and the assembly rate is variable. Shortage is allowed, and the unsatisfied demand is completely backlogged. Then, we formulate the proposed problem as a cost minimization model where the assembly rate and the production run time of each component process are decision variables. An algorithm for the computations of the optimal solutions under the constraint of assembly rate is also provided. Finally, a numerical example and sensitivity analysis are carried out to illustrate the model. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:285 / 293
页数:9
相关论文
共 28 条
[1]   A production lot size inventory model for deteriorating items and arbitrary production and demand rates [J].
Balkhi, ZT ;
Benkherouf, L .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 92 (02) :302-309
[2]  
Ben-Daya Mohamed, 2008, International Transactions in Operational Research, V15, P87, DOI 10.1111/j.1475-3995.2007.00620.x
[3]   Deterministic inventory models for variable production [J].
Bhunia, AK ;
Maiti, M .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (02) :221-224
[4]   On optimal manufacturing batch size with rework process at single-stage production system [J].
Cardenas-Barron, Leopoldo Eduardo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2007, 53 (01) :196-198
[5]  
Chakraborty S., 1988, Opsearch, V25, P75
[6]   ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS [J].
CROWSTON, WB ;
WAGNER, M ;
WILLIAMS, JF .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 19 (05) :517-527
[7]   Effect of inspection errors and preventive maintenance on a two-stage production inventory system [J].
Darwish, M. A. ;
Ben-Daya, M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (01) :301-313
[8]   Integrating resource and production decisions in a simple multi-stage assembly system [J].
Dellaert, N ;
de Kok, T .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 90 (03) :281-294
[9]   Push and pull strategies in multi-stage assembly systems [J].
Dellaert, NP ;
de Kok, AG .
STATISTICA NEERLANDICA, 2000, 54 (02) :175-189
[10]   Economic production quantity with rework process at a single-stage manufacturing system with planned backorders [J].
Eduardo Cardenas-Barron, Leopoldo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) :1105-1113