Post-Tensioned Glulam Beam-Column Joints with Advanced Damping Systems: Testing and Numerical Analysis

被引:60
|
作者
Smith, Tobias [1 ]
Ponzo, Felice C. [2 ]
Di Cesare, Antonio [2 ]
Pampanin, Stefano [1 ]
Carradine, David [1 ]
Buchanan, Andrew H. [1 ]
Nigro, Domenico [2 ]
机构
[1] Univ Canterbury, Dept Civil & Nat Resources Engn, Christchurch 1, New Zealand
[2] Univ Basilicata, Dipartimento Strutture, I-85100 Potenza, Italy
关键词
Timber Construction; Pres-Lam; Seismic Testing; Multi-Story Timber; Glulam; BEHAVIOR;
D O I
10.1080/13632469.2013.835291
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article describes tests investigating a feasible source of passive damping for post-tensioned glue-laminated (glulam) timber structures. This innovative structural system adapts precast concrete PRESSS technology [Priestley et al., 1999] to engineered wood products combining the use of post-tensioned tendons with large timber members. Current testing is aimed at further improvement of the system through additional energy dissipation. Testing has favorably compared glue-laminated timber (not previously implemented in this way) with laminated veneer lumber (LVL) used in New Zealand. After initial benchmark testing with post-tensioning only, a simple, minimally invasive and replaceable type of hysteretic damper was added.
引用
收藏
页码:147 / 167
页数:21
相关论文
共 50 条
  • [31] Experimental study on behaviors of beam-column connections for self-centering post-tensioned precast frame
    Cai, Xiaoning
    Meng, Shaoping
    Sun, Weiwei
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2012, 45 (12): : 29 - 37
  • [32] Moment response of post-tensioned timber beam-column connections in fire - Experimental behaviour of a simple connection
    Horne, Paul
    Abu, Anthony
    Palermo, Alessandro
    FIRE SAFETY JOURNAL, 2023, 141
  • [33] Experimental study on a new precast unbonded post-tensioned beam-column joint system with shear bracket
    Thinh, Do Tien
    Kusunoki, Koichi
    Tasai, Akira
    Journal of Structural and Construction Engineering, 2009, 74 (641): : 1249 - 1257
  • [34] NUMERICAL ANALYSIS OF WELDED BEAM-COLUMN JOINTS IN ALUMINUM STRUCTURES
    Hrzic, Tin
    Boko, Ivica
    Toric, Neno
    ELECTRONIC JOURNAL OF THE FACULTY OF CIVIL ENGINEERING OSIJEK-E-GFOS, 2020, 21 : 30 - 44
  • [35] Experimental and analytical investigations into the time-dependent performance in post-tensioned timber beam-column joints under sustained loads and varied environment
    Li, Zheng
    Zheng, Xiuzhi
    He, Minjuan
    Sun, Yongliang
    He, Guirong
    CONSTRUCTION AND BUILDING MATERIALS, 2020, 251
  • [36] Cyclic testing of unbonded post-tensioned concrete wall systems with and without supplemental damping
    Twigden, K. M.
    Sritharan, S.
    Henry, R. S.
    ENGINEERING STRUCTURES, 2017, 140 : 406 - 420
  • [37] Numerical analysis for seismic behavior of self-centering post-tensioned precast beam-to-column connections
    Cai X.-N.
    Meng S.-P.
    Gongcheng Lixue/Engineering Mechanics, 2016, 33 (03): : 143 - 151
  • [38] Numerical Analysis of Post-Tensioned Coupled Wall
    Cai, Xiaoning
    Meng, Shaoping
    Chen, Jiajia
    Sun, Weiwei
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 1935 - 1939
  • [39] Experimental investigations of the H-shaped post-tensioned precast frame module with monolithic beam-column connections
    Hong, Won-Kee
    Pham, Tien Dat
    Nguyen, Dinh Han
    Le, Thuc Anh
    Nguyen, Manh Cuong
    Nguyen, Van Tien
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024,
  • [40] Long-term behavior of reduced length FRP tendons in post-tensioned steel beam-column connections
    Fahmy, Mohamed F. M.
    Hassan, Ahmed Samy B. Z.
    Raheem, Shehata E. Abdel
    Abdo, Mohamed Abdel-Basset
    Algobahi, Redhwan M.
    ENGINEERING STRUCTURES, 2025, 331