共 20 条
- [1] Adeli H., 2001, Construction Scheduling, Cost Optimization, and Management - A New Model Based on Neurocomputing and Object Technologies
- [2] Azondekon S., 2002, 5 INT C INT RES NETW
- [7] Demeulemeester E., 1992, MANAGE SCI, V21, P944
- [9] Gademann N., 2004, IIE T, V37, P153
- [10] Kane H., 2012, P MOSIM 12 9 C INT M