共 50 条
- [1] PUSHOVER ANALYSIS OF A PRESTRESSED CONCRETE CONTINUOUS RIGID-FRAME BRIDGE WITH BOX-TYPE HIGH PIERS PROCEEDINGS OF THE ELEVENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOL I AND II, 2010, : 1561 - 1568
- [3] Fragility Analysis of Continuous Rigid Frame Bridge with Tall Piers CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 1403 - 1412
- [4] Structure simulation analysis on prestressed concrete continuous rigid-frame bridge under construction ISISS 2005: Innovation & Sustainability of Structures, Vol 1-3, 2005, : 645 - 652
- [5] Structural analysis and segment construction control experiment of prestressed concrete continuous rigid frame bridge ISISS 2005: Innovation & Sustainability of Structures, Vol 1-3, 2005, : 1148 - 1157
- [6] Long span prestressed concrete continuous rigid-frame bridge ANN construction control PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2261 - 2264
- [7] Research on Influences of Prestress Loss of Prestressed Concrete Continuous Rigid Frame Bridge on Midspan Deflection ARCHITECTURAL ENGINEERING AND NEW MATERIALS, 2015, : 173 - 182
- [8] Study on construction control of long-span V-shape rigid frame composite arch bridge Gou, H. (gouhongye@163.com), 1600, Chinese Society of Civil Engineering (46):
- [9] Application of fusing mechanism in the continuous rigid frame bridge with rocking piers Liu, Peng, 1600, Editorial Department of Journal of Railway Engineering Society, China (31):
- [10] Analysis on the Long-Term Deflection in Prestressed Concrete Continuous Rigid Frame Box Girder Bridge CICTP 2019: TRANSPORTATION IN CHINA-CONNECTING THE WORLD, 2019, : 192 - 201