Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology

被引:123
作者
Kim, Hyunjoo [1 ]
Anderson, Kyle [2 ]
Lee, SangHyun [2 ]
Hildreth, John [1 ]
机构
[1] Univ N Carolina, Charlotte, NC 28223 USA
[2] Univ Michigan, Ann Arbor, MI 48109 USA
关键词
Scheduling; Building information modeling (BIM); ifcXML; Data exchange; Critical path method; Activity sequence;
D O I
10.1016/j.autcon.2013.05.020
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The architecture, engineering, and construction industries have had rapid technological advancements over the last decade, particularly in the area of building information modeling (BIM). BIM stores all the information of a building and can be leveraged for many new and exciting applications including the generation of quantity takeoffs, 4D scheduling, and building simulations. The main objective in this study is to establish a framework for automating the generation of construction schedules by using data (e.g. spatial, geometric, quantity, relationship and material layer set information) stored in BIM. Using the extracted information, the proposed system in this research creates construction tasks, computes activity durations using available activity production rates, applies sequencing rules, and finally outputs a schedule. To demonstrate the functionality of this framework, a prototype system has been developed to import BIM representations with basic building elements such as slabs, walls, doors, windows, roofs, floors, and ceilings in two story buildings. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:285 / 295
页数:11
相关论文
共 17 条
[1]  
Aalami F, 1998, COMPUTING IN CIVIL ENGINEERING, P376
[2]  
[Anonymous], CONSTRUCTION PLANEX
[3]  
buildingSMART, 2012, 1 BUILDINGSMART
[4]  
Cherneff J., 1991, J COMPUT CIVIL ENG, V5, P64, DOI 10.1061/(ASCE)0887-3801(1991)5:1(64)
[5]  
Chevallier N, 1998, CAN J CIVIL ENG, V25, P1059
[6]   SEQUENCING KNOWLEDGE FOR CONSTRUCTION SCHEDULING [J].
ECHEVERRY, D ;
IBBS, CW ;
KIM, S .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (01) :118-130
[7]  
Echevery D., 1997, PROC 4 C COMPUTING C, P341
[8]   Scheduling with computer-interpretable construction method models [J].
Fischer, MA ;
Aalami, F .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (04) :337-347
[9]  
Froese T.M., 1999, ITCON, V4
[10]  
Graphisoft, 2011, GRAPH ARCHICAD 15