Process simulation of a dual-stage Selexol process for 95% carbon capture efficiency at an integrated gasification combined cycle power plant

被引:73
作者
Kapetaki, Zoe [1 ]
Brandani, Pietro [1 ]
Brandani, Stefano [1 ]
Ahn, Hyungwoong [1 ]
机构
[1] Univ Edinburgh, Scottish Carbon Capture & Storage Ctr, Inst Mat & Proc, Sch Engn, Edinburgh EH9 3JL, Midlothian, Scotland
基金
英国工程与自然科学研究理事会;
关键词
Selexol; Dual-stage Selexol process; Process simulation; Integrated gasification combined cycle; Carbon capture; HYDROGEN SOLUBILITY; HEAVY OIL; COAL; STORAGE;
D O I
10.1016/j.ijggc.2015.04.015
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
It was aimed to simulate a conventional dual-stage Selexol process for removing CO2 and H2S simultaneously from a synthesis gas (syngas) originated from a typical Integrated Gasification Combined Cycle (IGCC) power plant driven by a dry-coal fed gasifier using Honeywell UniSim R400. The solubilities of syngas components on Selexol were predicted by temperature-dependant Henry's law constants being newly evaluated in this study based on the experimental data in Xu et al. (1992). The operating conditions of the dual-stage Selexol unit were determined so as to meet simultaneously various performance targets, such as 99+% H-2 recovery, 90% CO2 recovery, 99+% H2S recovery, and less than 20 ppm H2S in CO2 product. By and large the resulting energy consumptions of the Selexol process were in good agreement with those reported in DOE NETL (2010) that this study was based on. It was shown that the integrated dual-stage Selexol unit could achieve 95% carbon capture rate as well as 90% by simply changing the operating conditions. By contrast a CO2 removal Selexol process having not an input of lean solvent generated by thermal regeneration could not achieve 95% carbon capture rate due to a pinch point formed at the top of the CO2 absorber. (C) 2015 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:17 / 26
页数:10
相关论文
共 29 条
[1]   Process simulation of a dual-stage Selexol unit for pre-combustion carbon capture at an IGCC power plant [J].
Ahn, Hyungwoong ;
Kapetaki, Zoe ;
Brandani, Pietro ;
Brandani, Stefano .
12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 :1751-1755
[2]   Process configuration studies of the amine capture process for coal-fired power plants [J].
Ahn, Hyungwoong ;
Luberti, Mauro ;
Liu, Zhengyi ;
Brandani, Stefano .
INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2013, 16 :29-40
[3]  
[Anonymous], 1979, GAS ABS SEL
[4]  
[Anonymous], 2013, RED UKS CARB FOOTPR
[5]  
[Anonymous], 2010, Cost and performance baseline for fossil energy plants Volume 1: Bituminous coal and natural gas to electricity, V1
[6]   Steady-State Simulation and Optimization of an Integrated Gasification Combined Cycle Power Plant with CO2 Capture [J].
Bhattacharyya, Debangsu ;
Turton, Richard ;
Zitney, Stephen E. .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2011, 50 (03) :1674-1690
[7]  
Bucklin R.W., 1984, ENERG PROG, P137
[8]  
Burr B., 2008, 87 ANN GPA CONV
[9]   Hydrogen solubility measurements in heavy oil and bitumen cuts [J].
Cai, HY ;
Shaw, JM ;
Chung, KH .
FUEL, 2001, 80 (08) :1055-1063
[10]   CO2 control technology effects on IGCC plant performance and cost [J].
Chen, Chao ;
Rubin, Edward S. .
ENERGY POLICY, 2009, 37 (03) :915-924