Heuristic Algorithm for a WIP Projection Problem at Finite Capacity in Semiconductor Manufacturing

被引:1
作者
Mhiri, Emna [1 ]
Mangione, Fabien [1 ]
Jacomino, Mireille [1 ]
Vialletelle, Philippe [2 ]
Lepelletier, Guillaume [3 ]
机构
[1] Univ Grenoble, G SCOP, CNRS, F-38000 Grenoble, France
[2] STMicroelectronics, Ind Engn Dept, F-38926 Crolles, France
[3] STMicroelectronics, F-38926 Crolles, France
关键词
WIP projection; finite capacity planning; semiconductor industry; mixed integer programming; iterative algorithm; WAFER FABRICATION FACILITY; PERFORMANCE EVALUATION; SCHEDULING MODELS; LEAD TIMES; SIMULATION; INDUSTRY; SYSTEM; DEMAND; FABS;
D O I
10.1109/TSM.2018.2792312
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we propose a heuristic approach for fixing work-in-progress (WIP) projection issues in the semiconductor industry especially for high mix low volume facilities. The considered problem consists of estimating the start and end dates for each remaining process step of the production lots in the WIP and anticipating the fab loading taking into account the constraints of the maximum throughput of machines considered as capacity constraints and customer delivery commitments. The objective being to guarantee on-time delivery, we focus on minimizing the total weighted tardiness. We have formulated the problem into a mixed-integer programming and we have empirically shown its computational intractability. Due to the computational intractability using actual production data, a heuristic algorithm is proposed. It is an iterative finite capacity planning system that considers as inputs lots due dates and equipment capabilities and capacities. The performance of the heuristic is assessed using industrial instances. It turns out that it achieves targeted objectives with satisfactory results in terms of quality of the solution and computation time.
引用
收藏
页码:62 / 75
页数:14
相关论文
共 52 条
  • [1] [Anonymous], 1979, Computers and Intractablity: A Guide to the Theory of NP-Completeness
  • [2] Zero-order production planning models with stochastic demand and workload-dependent lead times
    Aouam, Tarik
    Uzsoy, Reha
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (06) : 1661 - 1679
  • [3] Robust capacity planning in semiconductor manufacturing
    Barahona, F
    Bermon, S
    Günlük, O
    Hood, S
    [J]. NAVAL RESEARCH LOGISTICS, 2005, 52 (05) : 459 - 468
  • [4] Midterm Planning to Minimize Deviations From Daily Target Outputs in Semiconductor Manufacturing
    Bard, Jonathan F.
    Deng, Yumin
    Chacon, Rodolfo
    Stuber, John
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2010, 23 (03) : 456 - 467
  • [5] Capacity optimization planning system (CAPS)
    Bermon, S
    Hood, SJ
    [J]. INTERFACES, 1999, 29 (05) : 31 - 49
  • [6] Bermon S, 1995, PROCEEDINGS OF THE 34TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, P1935, DOI 10.1109/CDC.1995.480629
  • [7] MIXED MODEL ASSEMBLY SIMULATION
    CARLSON, JG
    YAO, AC
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1992, 26 (1-3) : 161 - 167
  • [8] Tool capacity planning in semiconductor manufacturing
    Çatay, B
    Erengüç, SS
    Vakharia, AJ
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (09) : 1349 - 1366
  • [9] Infinite capacity planning for IC packaging plants
    Chen, James C.
    Su, Ling-Huey
    Sun, Cheng-Ju
    Hsu, Mei-Fang
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (19) : 5729 - 5748
  • [10] Capacity requirements planning for twin Fabs of wafer fabrication
    Chen, James C.
    Fan, Yang-Chih
    Chen, Chia-Wen
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (16) : 4473 - 4496