HBDCWS: heuristic-based budget and deadline constrained workflow scheduling approach for heterogeneous clouds

被引:10
作者
Rizvi, Naela [1 ]
Ramesh, Dharavath [1 ]
机构
[1] Indian Inst Technol ISM, Dept Comp Sci & Engn, Dhanbad 826004, Jharkhand, India
关键词
Workflow scheduling; Budget; Deadline; Planning success ratio (PSR); SCIENTIFIC WORKFLOWS; ALGORITHM; PERFORMANCE;
D O I
10.1007/s00500-020-05127-9
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The predilection of scientific applications toward a high-performance computing system is attained through the emergence of the cloud. Large-scale scientific applications can be modeled as workflows and are scheduled on the cloud. However, such scheduling becomes even more onerous due to the dynamic and heterogeneous nature of cloud and therefore considered as a problem of NP-Complete. The scheduling of workflows is always constrained to QoS parameters. Most of the applications are bound to time and cost, which is observed to be the most crucial parameter. Therefore, in this paper, a heuristic-based budget and deadline constrained workflow scheduling algorithm (HBDCWS) has been proposed to utilize those applications that have the budget and deadline constraints. The novelty of the proposed work is to provide a simple budget and deadline distribution strategy where budget and deadline of workflow are converted to level budget and level deadline. Additionally, the level budget is again transferred to each task. This strategy not only satisfies the given constraints but also proves to be efficient for minimizing the makespan and reducing the cost of execution. Experimental results on several workflows demonstrate that the proposed HBDCWS algorithm finds a feasible solution that accomplishes the given constraints with a higher success rate in most cases.
引用
收藏
页码:18971 / 18990
页数:20
相关论文
共 43 条
[1]   Deadline-constrained workflow scheduling in software as a service Cloud [J].
Abrishami, S. ;
Naghibzadeh, M. .
SCIENTIA IRANICA, 2012, 19 (03) :680-689
[2]   Deadline-constrained workflow scheduling algorithms for Infrastructure as a Service Clouds [J].
Abrishami, Saeid ;
Naghibzadeh, Mahmoud ;
Epema, Dick H. J. .
FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2013, 29 (01) :158-169
[3]   Cost-aware challenges for workflow scheduling approaches in cloud computing environments: Taxonomy and opportunities [J].
Alkhanak, Ehab Nabiel ;
Lee, Sai Peck ;
Khan, Saif Ur Rehman .
FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2015, 50 :3-21
[4]   Low-time complexity budget-deadline constrained workflow scheduling on heterogeneous resources [J].
Arabnejad, Hamid ;
Barbosa, Jorge G. ;
Prodan, Radu .
FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2016, 55 :29-40
[5]   A Budget Constrained Scheduling Algorithm for Workflow Applications [J].
Arabnejad, Hamid ;
Barbosa, Jorge G. .
JOURNAL OF GRID COMPUTING, 2014, 12 (04) :665-679
[6]   Budget and Deadline Aware e-Science Workflow Scheduling in Clouds [J].
Arabnejad, Vahid ;
Bubendorfer, Kris ;
Ng, Bryan .
IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 2019, 30 (01) :29-44
[7]   Deadline Distribution Strategies for Scientific Workflow Scheduling in Commercial Clouds [J].
Arabnejad, Vahid ;
Bubendorfer, Kris ;
Ng, Bryan .
2016 IEEE/ACM 9TH INTERNATIONAL CONFERENCE ON UTILITY AND CLOUD COMPUTING (UCC), 2016, :70-78
[8]  
Barga R.S., 2008, 6 INT WORKSHOP CHALL, P63
[9]  
Bather J.A., 1994, MATH INDUCTION
[10]  
Bharathi S, 2008, 2008 THIRD WORKSHOP ON WORKFLOWS IN SUPPORT OF LARGE-SCALE SCIENCE (WORKS 2008), P11