Rescheduling strategies for integrating rush orders with preventive maintenance in a two-machine flow shop

被引:25
作者
Chiu, Yufang [1 ]
Shih, Ching-Ju [2 ]
机构
[1] Chung Yuan Christian Univ, Dept Ind & Syst Engn, Chungli, Taiwan
[2] Quanta Comp Inc, SIT Dept, Tao Yuan, Taiwan
关键词
scheduling; preventive maintenance; flow shop; ACCEPTANCE; POLICIES;
D O I
10.1080/00207543.2011.627887
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Preventive maintenance and rush orders are related. Although preventive maintenance is essential for maximising equipment reliability, it can substantially slow the manufacturing process. Rush order rescheduling involves similar conflicts. Scheduling maintains the robustness of the production schedule, but rush orders require rescheduling. Although preventive maintenance and rush orders are essential manufacturing processes, research on the integration of these functions is insufficient. Unlike recent work that analyses preventive maintenance or rush orders as separate functions, this study proposes an integrated model that analyses both preventive maintenance and rush orders in a two-machine flow shop. The model is then evaluated using two different rescheduling methods. Non-parametric analysis of the models revealed that these two rescheduling methods differ significantly under integrated maintenance and rush order situations.
引用
收藏
页码:5783 / 5794
页数:12
相关论文
共 22 条
[1]   Integrated production planning and preventive maintenance in deteriorating production systems [J].
Aghezzaf, El-Houssaine ;
Najid, Najib M. .
INFORMATION SCIENCES, 2008, 178 (17) :3382-3392
[2]   A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time [J].
Baraz, Daniel ;
Mosheiov, Gur .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (02) :810-813
[3]   Integrating preventive maintenance planning and production scheduling for a single machine [J].
Cassady, CR ;
Kutanoglu, E .
IEEE TRANSACTIONS ON RELIABILITY, 2005, 54 (02) :304-309
[4]  
Cheng C.Y., 2003, INT J APPL SCI ENG, V1, P114
[5]   ANALYSIS OF PERIODIC AND EVENT-DRIVEN RESCHEDULING POLICIES IN DYNAMIC SHOPS [J].
CHURCH, LK ;
UZSOY, R .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1992, 5 (03) :153-163
[6]   A production rescheduling expert simulation system [J].
Li, H ;
Li, ZC ;
Li, LX ;
Hu, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 124 (02) :283-293
[7]  
Masuchun R., 2004, P 5 AS CONTR C 20 23
[8]  
Najid N.M., 2011, INT J PROD RES, V49, P2165
[9]   Optimal periodic preventive maintenance policy for leased equipment [J].
Pongpech, J. ;
Murthy, D. N. P. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (07) :772-777
[10]   An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs [J].
Rajendran, C ;
Ziegler, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 103 (01) :129-138