An energy management system (EMS) strategy for combined heat and power (CHP) systems based on a hybrid optimization method employing fuzzy programming

被引:112
作者
Moradi, Mohammad H. [1 ]
Hajinazari, Mehdi [1 ]
Jamasb, Shahriar [2 ]
Paripour, Mahmoud [3 ]
机构
[1] Bu Ali Sina Univ, Fac Engn, Dept Elect Engn, Hamadan, Iran
[2] Hamedan Univ Technol, Dept Biomed Engn, Hamadan 65155, Iran
[3] Hamedan Univ Technol, Dept Sci, Hamadan 65155, Iran
关键词
Energy management system; Fuzzy set theory; Hybrid optimization method; Net present value; GREENHOUSE-GAS EMISSIONS; TRIGENERATION SYSTEMS; DISTRIBUTED GENERATION; COGENERATION SYSTEMS; OPERATION; MODEL; ALGORITHM; DISPATCH; LOAD; PERFORMANCE;
D O I
10.1016/j.energy.2012.10.005
中图分类号
O414.1 [热力学];
学科分类号
摘要
An optimization method, which considers the Combined Heat and Power (CHP) model under uncertainty, has been developed to determine the optimal capacities for the CHP and boiler such that thermal and electrical energy demands can be satisfied with high cost efficiency. The proposed method offers an energy management system (EMS) strategy which employs the fuzzy set theory to account for the uncertainties associated with electrical and thermal energy demands as well as those associated with natural gas and electrical power prices in order to determine the optimum ranges for boiler and CUP capacities which maximize an objective function based on the net present value (NPV). The reduction in operational strategy expenses arising from the monetary cost of the credit attainable by air pollution reduction is also taken into account in evaluation of the objective function. The optimal range for boiler and CHP capacities and the resulting projection for the range of optimal value of the objective function are derived using a hybrid optimization method involving the particle swarm optimization (PSO) and the linear programming algorithms. The viability of the proposed method is demonstrated by analyzing the decision to construct a CHP system for a typical hospital. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:86 / 101
页数:16
相关论文
共 50 条
[1]  
[Anonymous], CHP SIZ VERS 2
[2]  
[Anonymous], FUZZY SETS SYSTEMS
[3]  
Beihong Z, 2006, J ENERGY BUILD, V38, P189
[4]   Investment criteria for the selection of cogeneration plants -: a state of the art review [J].
Biezma, MV ;
San Cristóbal, JR .
APPLIED THERMAL ENGINEERING, 2006, 26 (5-6) :583-588
[5]   SOLVING SYSTEMS OF LINEAR FUZZY EQUATIONS [J].
BUCKLEY, JJ ;
QU, Y .
FUZZY SETS AND SYSTEMS, 1991, 43 (01) :33-43
[6]   Simulation and optimization of the performance in the air-conditioning season of a BCHP system in China [J].
Cao, Jia-cong ;
Liu, Feng-qiang .
ENERGY AND BUILDINGS, 2008, 40 (03) :185-192
[7]   A multiobjective evolutionary algorithm for the sizing and siting of distributed generation [J].
Celli, G ;
Ghiani, E ;
Mocci, S ;
Pilo, F .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :750-757
[8]   Stochastic multiobjective generation dispatch of combined heat and power systems [J].
Chang, CS ;
Fu, W .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1998, 145 (05) :583-591
[9]   Genetic algorithms and non-intrusive energy management system based economic dispatch for cogeneration units [J].
Chang, Hsueh-Hsien .
ENERGY, 2011, 36 (01) :181-190
[10]   Assessment of the greenhouse gas emissions from cogeneration and trigeneration systems. Part I: Models and indicators [J].
Chicco, Gianfranco ;
Mancarella, Pierluigi .
ENERGY, 2008, 33 (03) :410-417