The problems in solar building integrated development

被引:0
作者
Cao, Ping [1 ]
Wu, Nan [1 ]
机构
[1] Xian Univ Sci & Technol, Sch Civil Engn, Xian, Shaanxi, Peoples R China
来源
SUSTAINABLE DEVELOPMENT OF URBAN ENVIRONMENT AND BUILDING MATERIAL, PTS 1-4 | 2012年 / 374-377卷
关键词
solar building Integration; project; synchronous;
D O I
10.4028/www.scientific.net/AMR.374-377.296
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Energy conservation for building on the use of solar energy has been the attention all over the world. However, the process of building integrated solar energy, went through three stages: passive accept era, simple addition era and building integrated era. There are flaws on the solar energy light heat technology development and application, it reflects on the design, construction and solar energy product itself. These flaws can be compensated if the solar energy and the building integration energy-saving construction projects can be treated as the key link during the life cycle,cooperating with the project participants, can reach the goal of the solar energy and the building integration.
引用
收藏
页码:296 / 299
页数:4
相关论文
共 7 条
[1]  
Cao Ping, 2008, OWNER MAIN FUNCTIONS
[2]  
Ding ShiZhao, 2003, TONGJI U EC MANAGEME
[3]  
from linuo rhett new energy Co. LTD, 2011, SOL EN BUILD INT APP
[4]  
Jiang Tinghui, 2010, TAIZHOU SOLAR WATER
[5]  
Jiang Y., 2005, J. HVAC, V5, P30
[6]  
Mao Jun, 2010, ENGINEERING, P93
[7]   Towards an improved architectural quality of building integrated solar thermal systems (BIST) [J].
Probst, MariaCristina Munari ;
Roecker, Christian .
SOLAR ENERGY, 2007, 81 (09) :1104-1116