Assembly Model Based on Dynamic Transition Graph for Satellite General Assembly Process Planning

被引:0
|
作者
Sun, Gang [1 ]
Yu, Jianfeng [2 ]
Li, Yuan [2 ]
机构
[1] Inst Beijing Satellite Environm Engn, Beijing 100094, Peoples R China
[2] Northwestern Polytech Univ, Key Lab Contemporary Design & Integrated Mfg Tech, Minist Educ, Xian 710072, Peoples R China
关键词
Assembly process planning; Liaison graph; Cut sets; ALGORITHM;
D O I
10.4028/www.scientific.net/AMR.430-432.1542
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Beginning with the disassembly of the semi-finished modules, the general assembly process of satellites is quite different from that of other mechanical products. This kind of disassembly-reassembly process cannot be solved by the widely used cut-set theory that only deals with linear problems, thus an approach called Dynamic Transition Graph (DTG) is proposed to solve this nonlinear assembly sequence planning problem. By analyzing and verifying possible assembly statuses hierarchically through matrix operations, a DIG is produced on the basis of Liaison Graph, where the DTG includes all the geometric feasible assembly sequences for the general assembly of satellite. Finally, the effectiveness of this method is verified by an example.
引用
收藏
页码:1542 / +
页数:2
相关论文
共 50 条
  • [31] Assembly Sequence Planning Based on Hierarchical Model
    Li, Chunxi
    Hou, Wenjun
    WIRELESS COMMUNICATIONS & MOBILE COMPUTING, 2022, 2022
  • [32] AI-BASED PROCESS PLANNING FOR ELECTRONIC ASSEMBLY
    SRINIVASAN, K
    SANII, ET
    IIE TRANSACTIONS, 1991, 23 (02) : 127 - 137
  • [33] KNOWLEDGE-BASED PROCESS PLANNING FOR ELECTRONIC ASSEMBLY
    IRIZARRYGASKINS, VM
    CHANG, TC
    JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS, 1990, 3 (01) : 3 - 16
  • [34] Research on assembly sequence planning method for large-scale assembly based on an integrated assembly model
    Zhao, S.
    Hong, J.
    Zhao, H.
    Li, S.
    Ding, L.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2012, 226 (B4) : 733 - 744
  • [35] Optimizing assembly sequence planning using precedence graph-based assembly subsets prediction method
    Zhang, Nan
    Liu, Zhenyu
    Qiu, Chan
    Hu, Weifei
    Tan, Jianrong
    ASSEMBLY AUTOMATION, 2020, 40 (02) : 361 - 375
  • [36] A new assembly relationship model supporting assembly reorganization for assembly planning
    Wang, Xiaoyi
    Wang, Quanxian
    Wang, Huifeng
    Zhang, Youliang
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2007, VOLS 1 AND 2, 2007, : 1536 - 1540
  • [37] GRAPH ORIENTED SIMULATION OF ASSEMBLY PROCESS
    BINGER, G
    FLEMMING, V
    SYSTEMS ANALYSIS MODELLING SIMULATION, 1989, 6 (10): : 781 - 786
  • [38] An intelligent decision-making system for assembly process planning based on machine learning considering the variety of assembly unit and assembly process
    Zhang, Sheng-Wen
    Wang, Zhan
    Cheng, De-Jun
    Fang, Xi-Feng
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2022, 121 (1-2): : 805 - 825
  • [39] An intelligent decision-making system for assembly process planning based on machine learning considering the variety of assembly unit and assembly process
    Sheng-Wen Zhang
    Zhan Wang
    De-Jun Cheng
    Xi-Feng Fang
    The International Journal of Advanced Manufacturing Technology, 2022, 121 : 805 - 825
  • [40] Rearrangement Planning for General Part Assembly
    Li, Yulong
    Zeng, Andy
    Song, Shuran
    CONFERENCE ON ROBOT LEARNING, VOL 229, 2023, 229