A heuristic approach for U-shaped assembly line balancing to improve labor productivity

被引:49
作者
Avikal, Shwetank [1 ]
Jain, Rajeev [2 ]
Mishra, P. K. [1 ]
Yadav, H. C. [1 ]
机构
[1] Motilal Nehru Natl Inst Technol, Dept Mech Engn, Allahabad, Uttar Pradesh, India
[2] Kalaniketan Polytech Coll, Dept Mech Engn, Jabalpur, India
关键词
Assembly line balancing; Critical path method; Heuristics; Labor productivity; U-shaped line; ALGORITHM-BASED APPROACH; PETRI-NET;
D O I
10.1016/j.cie.2013.01.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The assembly line balancing problem is a non deterministic polynomial type planning problem for mass production. Layout design changes constitute a major decision that yields investment for assembly operations and numerous heuristics have been reported in the literature for solving the line balancing problems. U-shaped assembly layout offers several benefits over traditional straight-line layout in implementation of lean manufacturing and just-In-Time technology. In the paper an attempt has been made to evaluate labor productivity in U-shaped line system and straight line system. A Critical Path Method (CPM) based approach for U-shaped assembly line has been applied for assigning the task to the work stations for assembly line layout. Results show that the CPM based U-shaped approach performs better and improve the labor productivity of assembly line layout. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:895 / 901
页数:7
相关论文
共 52 条