A heuristic approach for U-shaped assembly line balancing to improve labor productivity

被引:50
作者
Avikal, Shwetank [1 ]
Jain, Rajeev [2 ]
Mishra, P. K. [1 ]
Yadav, H. C. [1 ]
机构
[1] Motilal Nehru Natl Inst Technol, Dept Mech Engn, Allahabad, Uttar Pradesh, India
[2] Kalaniketan Polytech Coll, Dept Mech Engn, Jabalpur, India
关键词
Assembly line balancing; Critical path method; Heuristics; Labor productivity; U-shaped line; ALGORITHM-BASED APPROACH; PETRI-NET;
D O I
10.1016/j.cie.2013.01.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The assembly line balancing problem is a non deterministic polynomial type planning problem for mass production. Layout design changes constitute a major decision that yields investment for assembly operations and numerous heuristics have been reported in the literature for solving the line balancing problems. U-shaped assembly layout offers several benefits over traditional straight-line layout in implementation of lean manufacturing and just-In-Time technology. In the paper an attempt has been made to evaluate labor productivity in U-shaped line system and straight line system. A Critical Path Method (CPM) based approach for U-shaped assembly line has been applied for assigning the task to the work stations for assembly line layout. Results show that the CPM based U-shaped approach performs better and improve the labor productivity of assembly line layout. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:895 / 901
页数:7
相关论文
共 52 条
[31]  
Maskell B.H., 1991, PERFORMANCE MEASUREM
[32]   THE U-LINE LINE BALANCING PROBLEM [J].
MILTENBURG, GJ ;
WIJNGAARD, J .
MANAGEMENT SCIENCE, 1994, 40 (10) :1378-1388
[33]   Balancing and Scheduling Mixed-Model U-Shaped Production Lines [J].
John Miltenburg .
International Journal of Flexible Manufacturing Systems, 2002, 14 (2) :119-151
[34]   Balancing U-lines in a multiple U-line facility [J].
Miltenburg, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (01) :1-23
[35]   U-shaped production lines: A review of theory and practice [J].
Miltenburg, J .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 70 (03) :201-214
[36]  
Modern Y., 1983, TOYOTA PRODUCTION SY
[37]  
Monden Y., 1993, TOYOTA PRODUCTION SY, V2nd
[38]   Optimal allocation of heterogeneous workers in a U-shaped production line [J].
Nakade, Koichi ;
Nishiwaki, Rei .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (03) :432-440
[39]   A management design approach to a simple flexible assembly system [J].
Nakase, N ;
Yamada, T ;
Matsui, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :281-292
[40]   Constraint-based simulated annealing (CBSA) approach to solve the disassembly scheduling problem [J].
Prakash, P. K. S. ;
Ceglarek, D. ;
Tiwari, M. K. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (9-12) :1125-1137