Top ten reasons for process improvement project failures

被引:54
作者
Antony, Jiju [1 ]
Gupta, Sandeep [2 ]
机构
[1] Heriot Watt Univ, Sch Management & Languages, Dept Business Management, Edinburgh, Midlothian, Scotland
[2] Heriot Watt Univ, Sch Management & Languages, Edinburgh, Midlothian, Scotland
关键词
Six sigma; Lean; Continuous improvement; Process improvement; Lean six sigma; Project failures; Termination; INTEGRATION; FRAMEWORK;
D O I
10.1108/IJLSS-11-2017-0130
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The purpose of this paper is to provide the top ten reasons of process improvement projects termination or failure to Lean and Six Sigma professionals and researchers. Design/methodology/approach The top ten reasons of process improvement projects termination or failure are based on literature, interaction of authors with Lean Six Sigma Master Black Belts, consultants, practitioners and trainers on various topics of Lean, Six Sigma, general quality management and continuous improvement along several years' experience of the authors. Findings The top ten reasons in our opinion include lack of commitment and support from top management; poor communication practices; incompetent team; inadequate training and learning; faulty selection of process improvement methodology and its associated tools/techniques; inappropriate rewards and recognition system/culture; scope creepiness; sub-optimal team size and composition; inconsistent monitoring and control; and resistance to change. Research limitations/implications - The top ten reasons mentioned in this study are based on only literature and authors' opinion. The authors of this paper have been pursuing a global study to critically evaluate the reasons behind process improvement projects failure based on a case- study approach. Originality/value - The chief operations officers and senior executives of various businesses can use these top ten reasons to develop project failure risk mitigation strategies and save significant cash- savings associated with such project terminations or failures in some other cases.
引用
收藏
页码:367 / 374
页数:8
相关论文
共 23 条
  • [1] Buffington K.W., 2002, Engineering Management Journal, V14, P25
  • [2] Coronado R., 2002, The TQM Magazine, V14, P92, DOI [DOI 10.1108/09544780210416702, 10.1108/09544780210416702]
  • [3] Crawford P., 2003, INT J PROJ MANAG, V21, P363, DOI DOI 10.1016/S0263-7863(02)00060-1
  • [4] DiMattia S, 1997, LIBR J, V122, P33
  • [5] Eckes G., 2000, The Six Sigma Revolution. Ed
  • [6] The interactive effect of team dynamics and organizational support on ICT project success
    Gelbard, Roy
    Carmeli, Abraham
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (05) : 464 - 470
  • [7] Managing IT projects: communication pitfalls and bridges
    Gillard, S
    [J]. JOURNAL OF INFORMATION SCIENCE, 2005, 31 (01) : 37 - 43
  • [8] Goldhaber G.M., 1979, Auditing organizational communication systems
  • [9] Hougham M., 1996, International Journal of Project Management, V14, P103, DOI 10.1016/0263-7863(95)00067-4
  • [10] A framework for identifying software project risks
    Keil, M
    Cule, PE
    Lyytinen, K
    Schmidt, RC
    [J]. COMMUNICATIONS OF THE ACM, 1998, 41 (11) : 76 - 83