Need for Alternative Research Approaches in Construction Management: Case of Delay Studies

被引:82
作者
AlSehaimi, Abdullah [1 ]
Koskela, Lauri [2 ]
Tzortzopoulos, Patricia [2 ]
机构
[1] Minist Hlth, Medinah, Saudi Arabia
[2] Univ Salford, Sch Built Environm, Salford M5 4WT, Lancs, England
基金
英国工程与自然科学研究理事会;
关键词
Construction delay; Action research; Constructive research; DESIGN SCIENCE; DISPUTES;
D O I
10.1061/(ASCE)ME.1943-5479.0000148
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Over the years, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite significant consensus, most published studies fall short of providing clear recommendations for the improvement of project management practice. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular causes of delay. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated through alternative research approaches, i.e.,action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:407 / 413
页数:7
相关论文
共 54 条
  • [1] Delay mitigation in the Malaysian construction industry
    Abdul-Rahman, H
    Berawi, MA
    Berawi, AR
    Mohamed, O
    Othman, M
    Yahya, IA
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (02) : 125 - 133
  • [2] Causes of delays in Saudi Arabian public sector construction projects
    Al-Kharashi, Adel
    Skitmore, Martin
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) : 3 - 23
  • [3] Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51
  • [4] The significant factors causing delay of building construction projects in Malaysia
    Alaghbari, Wa'el
    Kadir, Mohd. Razali A.
    Salim, Azizah
    Ernawati
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) : 192 - +
  • [5] Alkass S., 1996, CONSTR MANAG ECON, V14, P375, DOI [DOI 10.1080/014461996373250, 10.1080/014461996373250]
  • [6] Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman
    Alnuaimi, Ali S.
    Taha, Ramzi A.
    Al Mohsin, Mohammed
    Al-Harthi, Ali S.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 615 - 622
  • [7] [Anonymous], INT J CONSTR ED RES
  • [8] [Anonymous], 1979, ACTION SCI
  • [9] [Anonymous], 2006, INT J PROJECT MANAGE, DOI DOI 10.1016/j.ijproman.2005.11.010
  • [10] Selecting a delay analysis method in resolving construction claims
    Department of Civil and Architectural Engineering, Illinois Institute of Technology, Construction Engineering and Management Program, 3201 South Dearborn Street, Chicago, IL 60616, United States
    [J]. Int. J. Proj. Manage., 2006, 2 (145-155): : 145 - 155