HOPS - Hamming-Oriented Partition Search production planning in the spinning industry

被引:22
作者
Camargo, Victor C. B. [1 ,2 ]
Toledo, Franklina M. B. [2 ]
Almada-Lobo, Bernardo [1 ]
机构
[1] Univ Porto, INESC TEC, Fac Engn, P-4200465 Oporto, Portugal
[2] Univ Sao Paulo, Inst Ciencias Matemat & Computac, BR-13560970 Sao Carlos, SP, Brazil
基金
巴西圣保罗研究基金会;
关键词
Matheuristic; Lot-sizing and scheduling problems; Textile industry; Mixed integer programming; LOT; SETUP; HEURISTICS;
D O I
10.1016/j.ejor.2013.10.017
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we investigate a two-stage lot-sizing and scheduling problem in a spinning industry. A new hybrid method called HOPS (Hamming-Oriented Partition Search), which is a branch-and-bound based procedure that incorporates a fix-and-optimize improvement method is proposed to solve the problem. An innovative partition choice for the fix-and-optimize is developed. The computational tests with generated instances based on real data show that HOPS is a good alternative for solving mixed integer problems with recognized partitions such as the lot-sizing and scheduling problem. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:266 / 277
页数:12
相关论文
共 35 条
[1]   Production planning and scheduling in the glass container industry: A VNS approach [J].
Almada-Lobo, Bernardo ;
Oliveira, Jose F. ;
Carravilla, Maria Antonia .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 114 (01) :363-375
[2]   Modelling practical lot-sizing problems as mixed-integer programs [J].
Belvaux, G ;
Wolsey, LA .
MANAGEMENT SCIENCE, 2001, 47 (07) :993-1007
[3]   Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs [J].
Beraldi, Patrizia ;
Ghiani, Gianpaolo ;
Grieco, Antonio ;
Guerriero, Emanuela .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (11) :3644-3656
[4]   Single item lot sizing problems [J].
Brahimi, N ;
Dauzere-Peres, S ;
Najid, NM ;
Nordli, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (01) :1-16
[5]   Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries [J].
Camargo, V. C. B. ;
Toledo, F. M. B. ;
Almada-Lobo, B. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (11) :1613-1630
[6]   Lot sizing and scheduling: industrial extensions and research opportunities [J].
Clark, Alistair ;
Almada-Lobo, Bernardo ;
Almeder, Christian .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (09) :2457-2461
[7]   Exploring relaxation induced neighborhoods to improve MIP solutions [J].
Danna, E ;
Rothberg, E ;
Le Pape, C .
MATHEMATICAL PROGRAMMING, 2005, 102 (01) :71-90
[8]   Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups [J].
de Araujo, Silvio A. ;
Arenales, Marcos N. ;
Clark, Alistair R. .
JOURNAL OF HEURISTICS, 2007, 13 (04) :337-358
[9]   Benchmarking optimization software with performance profiles [J].
Dolan, ED ;
Moré, JJ .
MATHEMATICAL PROGRAMMING, 2002, 91 (02) :201-213
[10]   Lot sizing and scheduling - Survey and extensions [J].
Drexl, A ;
Kimms, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 99 (02) :221-235