A Concept for Automated Construction Progress Monitoring: Technologies Adoption for Benchmarking Project Performance Control

被引:58
作者
Alizadehsalehi, Sepehr [1 ]
Yitmen, Ibrahim [1 ]
机构
[1] Eastern Mediterranean Univ, Dept Civil Engn, Mersin 10, Gazimagusa, Kibris, Turkey
关键词
Automated progress monitoring; Project performance control; Construction projects; Structural equation modeling; Benefit analysis; MODEL; BIM; MANAGEMENT; SUCCESS; SCHEDULE; IMPACT; COST; KNOWLEDGE; FRAMEWORK; TRACKING;
D O I
10.1007/s13369-018-3669-1
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Despite recent advances in technologies and equipment for automated progress monitoring, most construction companies worldwide do not utilize them for their projects. This can be due to many reasons, such as the high cost of technologies and equipment, need for skilled staff, and lack of sufficient information about the impact of automated progress monitoring on project performance control. The aim of the present research is to investigate the impact of automated progress monitoring on key project performance indicators: time, cost, and quality. This study prepared based on a survey of contracting and engineering consulting firms in North America, Europe, and the Middle East. In the first part of this study, structural equation modeling is used to identify the relations of different factors of project progress monitoring (both conventional and automated) with project performance control. In the second part of the study, a benefit analysis is evaluated based on the sixteen (16) journal and international conference papers and also twenty-four (24) international construction projects for which automated progress monitoring was employed. The research findings validate the positive impact of real-time, accurate, and cost-effective automated progress monitoring environments and reveal how automated progress monitoring affects construction project success.
引用
收藏
页码:4993 / 5008
页数:16
相关论文
共 96 条
[2]   Analysis of cost and schedule performance of international development projects [J].
Ahsan, Kamrul ;
Gunawan, Indra .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (01) :68-78
[3]  
Aibinu A.A., 2002, INT J PROJ MANAG, V20, P593, DOI DOI 10.1016/S0263-7863(02)00028-5
[4]   Monitoring project duration and cost in a construction project by applying statistical quality control charts [J].
Aliverdi, Reza ;
Naeni, Leila Moslemi ;
Salehipour, Amir .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (03) :411-423
[5]   The effectiveness of an integrated BIM/UAV model in managing safety on construction sites [J].
Alizadehsalehi, Sepehr ;
Yitmen, Ibrahim ;
Celik, Tolga ;
Arditi, David .
INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2020, 26 (04) :829-844
[6]   The Impact of Field Data Capturing Technologies on Automated Construction Project Progress Monitoring [J].
Alizadehsalehi, Sepehr ;
Yitmen, Ibrahim .
WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM 2016, WMCAUS 2016, 2016, 161 :97-103
[7]  
Alizadehsalehi S, 2015, AEI 2015: BIRTH AND LIFE OF THE INTEGRATED BUILDING, P163
[8]  
Alotaibi N.O., 2016, Journal of Engineering, Project, and Production Management, V6, P90, DOI DOI 10.32738/JEPPM.201607.0003
[9]   The impact of contractors' attributes on construction project success: A post construction evaluation [J].
Alzahrani, Jaman I. ;
Emsley, Margaret W. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (02) :313-322
[10]  
[Anonymous], 2007, P 7 INT C CONSTR APP