MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints

被引:42
|
作者
Ramezanian, Reza [1 ]
Saidi-Mehrabad, Mohammad [1 ]
Fattahi, Parviz [2 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[2] Bu Ali Sina Univ, Dept Ind Engn, Hamadan, Iran
关键词
Dynamic lot-sizing and scheduling; Flow shop; Availability constraint; Sequence-dependent setup; Mixed-integer programming; MIP-based heuristic; INTEGRATED PRODUCTION; MACHINE AVAILABILITY; MULTILEVEL; MAKESPAN;
D O I
10.1016/j.jmsy.2013.01.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, the problem of lot-sizing and scheduling of multiple product types in a capacitated flow shop with availability constraints for multi-period planning horizon is considered. In many real production systems, machines may be unavailable due to breakdowns or preventive maintenance activities, thus integrating lot-sizing and scheduling with maintenance planning is necessary to model real manufacturing conditions. Two variants are considered to deal with the maintenance activities. In the first, the starting times of maintenance tasks are fixed, whereas in the second one, maintenance must be carried out in a given time window. A new mixed-integer programming (MIP) model is proposed to formulate the problem with sequence-dependent setups and availability constraints. The objective is to find a production and preventive maintenance schedule that minimizes production, holding and setup costs. Three MIP-based heuristics with rolling horizon framework are developed to generate the integrated plan. Computational experiments are performed on randomly generated instances to show the efficiency of the heuristics. To evaluate the validity of the solution methods, problems with different scales have been studied and the results are compared with the lower bound. Computational experiments demonstrate that the performed methods have good-quality results for the test problems. (C) 2013 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:392 / 401
页数:10
相关论文
共 50 条
  • [31] Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method
    Alimian, Mahyar
    Ghezavati, Vahidreza
    Tavakkoli-Moghaddam, Reza
    Ramezanian, Reza
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 168
  • [32] MIP Formulations for a Rich Real-World Lot-Sizing Problem with Setup Carryover
    Focacci, Filippo
    Furini, Fabio
    Gabrel, Virginie
    Godard, Daniel
    Shen, Xueying
    COMBINATORIAL OPTIMIZATION, ISCO 2016, 2016, 9849 : 123 - 134
  • [33] A dynamic multi-plant lot-sizing and distribution problem
    Darvish, Maryam
    Larrain, Homero
    Coelho, Leandro C.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (22) : 6707 - 6717
  • [34] An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
    Wu, Tao
    Shi, Leyuan
    Geunes, Joseph
    Akartunali, Kerem
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 214 (02) : 428 - 441
  • [35] Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory
    Brahimi, Nadjib
    Absi, Nabil
    Dauzere-Peres, Stephane
    Kedad-Sidhoum, Safia
    OR SPECTRUM, 2015, 37 (04) : 983 - 1006
  • [36] Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory
    Nadjib Brahimi
    Nabil Absi
    Stéphane Dauzère-Pérès
    Safia Kedad-Sidhoum
    OR Spectrum, 2015, 37 : 983 - 1006
  • [37] Extended formulation and valid inequalities for the multi-item inventory lot-sizing problem with supplier selection
    Cardenas-Barron, Leopoldo E.
    Melo, Rafael A.
    Santos, Marcio C.
    COMPUTERS & OPERATIONS RESEARCH, 2021, 130 (130)
  • [38] Capacitated Lot-Sizing Problem with Sequence-Dependent Setup, Setup Carryover and Setup Crossover
    Kang, Jangha
    PROCESSES, 2020, 8 (07)
  • [39] On the availability and changeover cases of the general lot-sizing and scheduling problem with maintenance modelling: a Lagrangian-based heuristic approach
    Alimian, Mahyar
    Ghezavati, Vahidreza
    Tavakkoli-Moghaddam, Reza
    Ramezanian, Reza
    OPERATIONAL RESEARCH, 2024, 24 (02)
  • [40] On the discrete lot-sizing and scheduling problem with sequence-dependent changeover times
    Gicquel, C.
    Minoux, M.
    Dallery, Y.
    OPERATIONS RESEARCH LETTERS, 2009, 37 (01) : 32 - 36