MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints

被引:42
|
作者
Ramezanian, Reza [1 ]
Saidi-Mehrabad, Mohammad [1 ]
Fattahi, Parviz [2 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[2] Bu Ali Sina Univ, Dept Ind Engn, Hamadan, Iran
关键词
Dynamic lot-sizing and scheduling; Flow shop; Availability constraint; Sequence-dependent setup; Mixed-integer programming; MIP-based heuristic; INTEGRATED PRODUCTION; MACHINE AVAILABILITY; MULTILEVEL; MAKESPAN;
D O I
10.1016/j.jmsy.2013.01.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, the problem of lot-sizing and scheduling of multiple product types in a capacitated flow shop with availability constraints for multi-period planning horizon is considered. In many real production systems, machines may be unavailable due to breakdowns or preventive maintenance activities, thus integrating lot-sizing and scheduling with maintenance planning is necessary to model real manufacturing conditions. Two variants are considered to deal with the maintenance activities. In the first, the starting times of maintenance tasks are fixed, whereas in the second one, maintenance must be carried out in a given time window. A new mixed-integer programming (MIP) model is proposed to formulate the problem with sequence-dependent setups and availability constraints. The objective is to find a production and preventive maintenance schedule that minimizes production, holding and setup costs. Three MIP-based heuristics with rolling horizon framework are developed to generate the integrated plan. Computational experiments are performed on randomly generated instances to show the efficiency of the heuristics. To evaluate the validity of the solution methods, problems with different scales have been studied and the results are compared with the lower bound. Computational experiments demonstrate that the performed methods have good-quality results for the test problems. (C) 2013 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:392 / 401
页数:10
相关论文
共 50 条
  • [21] Single-machine capacitated lot-sizing and scheduling with delivery dates and quantities
    Boctor, Fayez F.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (24) : 7345 - 7359
  • [22] Asynchronous teams for joint lot-sizing and scheduling problem in flow shops
    Belo Filho, Marcio A. F.
    Santos, Maristela O.
    Meneses, Claudio N.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 5809 - 5822
  • [23] Parallel machine, capacitated lot-sizing and scheduling for the pipe-insulation industry
    de Armas, Jesica
    Laguna, Manuel
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (03) : 800 - 817
  • [24] Proportional lot-sizing and scheduling problem with identical parallel machines
    Kaczmarczyk, Waldemar
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (09) : 2605 - 2623
  • [25] Multi-item capacitated lot-sizing problem in a flow-shop system with energy consideration
    Masmoudi, Oussama
    Yalaoui, Alice
    Ouazene, Yassine
    Chehade, Hicham
    IFAC PAPERSONLINE, 2016, 49 (12): : 301 - 306
  • [26] A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem
    Wolosewicz, Cathy
    Dauzere-Peres, Stephane
    Aggoune, Riad
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (01) : 3 - 12
  • [27] A General Approach to Multi-item Capacitated Dynamic Lot-sizing Problems
    Li, Yanzhi
    Tao, Yi
    Wang, Fan
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 797 - +
  • [28] A hybrid optimization approach for multi-level capacitated lot-sizing problems
    Almeder, Christian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 200 (02) : 599 - 606
  • [29] A hybrid general lot-sizing and scheduling formulation for a production process with a two-stage product structure
    Transchel, Sandra
    Minner, Stefan
    Kallrath, Josef
    Loehndorf, Nils
    Eberhard, Ulrich
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (09) : 2463 - 2480
  • [30] Solving the integrated lot-sizing and job-shop scheduling problem
    Urrutia, Edwin David Gomez
    Aggoune, Riad
    Dauzere-Peres, Stephane
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (17) : 5236 - 5254