Model and scheduling of a continuous galvanizing line

被引:0
|
作者
Gao, Cong [1 ]
Tang, Lixin [1 ]
Wang, Ying [1 ]
机构
[1] Northeastern Univ, Inst Logist, Shenyang, Liaoning, Peoples R China
来源
IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2 | 2008年
关键词
Tabu Search; steel industry; modeling;
D O I
10.1109/SOLI.2008.4682827
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, we introduce a continuous galvanizing line in a steel plant which is one of the biggest iron and steel enterprises of the world. The continuous galvanizing line we research produces principally two kinds of coils, inner coils and outer coils. Due to the technical constraint, outer coils can not be produced continuously more than a specified number. So the inner coils must be inserted between outer coils. The difficulty of solving the problem is the interrelation of sequencing these two kinds of coils. No model and algorithm about such a scheduling problem has. been published. We propose an integer programming model to describe the scheduling problem. To solve the problem, a heuristic based on tabu search is developed. Due to the model of the scheduling problem is an integer programming model, problems with less than 100 coils can be solved by CPLEX 11.0 MIP optimizer to obtain the optimal solution or a lower bound of the problem. By comparing our heuristic schedule and the CPLEX schedule, the tabu search heuristic is proven to be effective.
引用
收藏
页码:1829 / 1834
页数:6
相关论文
共 50 条
  • [21] Local search metaheuristics for discrete-continuous scheduling problems
    Jozefowska, J
    Mika, M
    Rozycki, R
    Waligora, G
    Weglarz, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 354 - 370
  • [22] Lean Six Sigma 4.0 in an empirical application: a case of digital measurement for thickness deviation on a galvanizing line in a steel industry
    Diniz, Renan Souza
    Torre, Nuno Miguel De Matos
    Bonamigo, Andrei
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2025,
  • [23] Modeling of Predictive Maintenance Systems for Laser-Welders in Continuous Galvanizing Lines Based on Machine Learning with Welder Control Data
    Choi, Jin-Seong
    Choi, So-Won
    Lee, Eul-Bum
    SUSTAINABILITY, 2023, 15 (09)
  • [24] An investigation of the group scheduling heuristics in a flow-line cell
    Huzayyin, AS
    Badr, MA
    Helal, ME
    CURRENT ADVANCES IN MECHANICAL DESIGN AND PRODUCTION VII, 2000, : 591 - 601
  • [25] A GENERAL-MODEL FOR SCHEDULING PROBLEMS
    BRUNS, R
    APPELRATH, HJ
    WIRTSCHAFTSINFORMATIK, 1991, 33 (06): : 516 - 525
  • [26] Development and testing of an irrigation scheduling model
    George, BA
    Shende, SA
    Raghuwanshi, NS
    AGRICULTURAL WATER MANAGEMENT, 2000, 46 (02) : 121 - 136
  • [27] A performance analysis of Tabu search for discrete-continuous scheduling problems
    Józefowska, J
    Waligóra, G
    Weglarz, J
    METAHEURISTICS: COMPUTER DECISION-MAKING, 2004, 86 : 385 - +
  • [28] Tabu list management methods for a discrete-continuous scheduling problem
    Józefowska, J
    Waligóra, G
    Weglarz, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 137 (02) : 288 - 302
  • [29] A mathematical model for continuous crystallization
    Rachah, A.
    Noll, D.
    Espitalier, F.
    Baillon, F.
    MATHEMATICAL METHODS IN THE APPLIED SCIENCES, 2016, 39 (05) : 1101 - 1120
  • [30] OFF-LINE AND DYNAMIC PRODUCTION SCHEDULING - A COMPARATIVE CASE STUDY
    Bozek, Andrzej
    Wysocki, Marian
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2016, 7 (01) : 21 - 32