Model and scheduling of a continuous galvanizing line

被引:0
|
作者
Gao, Cong [1 ]
Tang, Lixin [1 ]
Wang, Ying [1 ]
机构
[1] Northeastern Univ, Inst Logist, Shenyang, Liaoning, Peoples R China
来源
IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2 | 2008年
关键词
Tabu Search; steel industry; modeling;
D O I
10.1109/SOLI.2008.4682827
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, we introduce a continuous galvanizing line in a steel plant which is one of the biggest iron and steel enterprises of the world. The continuous galvanizing line we research produces principally two kinds of coils, inner coils and outer coils. Due to the technical constraint, outer coils can not be produced continuously more than a specified number. So the inner coils must be inserted between outer coils. The difficulty of solving the problem is the interrelation of sequencing these two kinds of coils. No model and algorithm about such a scheduling problem has. been published. We propose an integer programming model to describe the scheduling problem. To solve the problem, a heuristic based on tabu search is developed. Due to the model of the scheduling problem is an integer programming model, problems with less than 100 coils can be solved by CPLEX 11.0 MIP optimizer to obtain the optimal solution or a lower bound of the problem. By comparing our heuristic schedule and the CPLEX schedule, the tabu search heuristic is proven to be effective.
引用
收藏
页码:1829 / 1834
页数:6
相关论文
共 50 条
  • [1] Scheduling in a continuous galvanizing line
    Valls Verdejo, Vicente
    Perez Alarco, M. Angeles
    Lino Sorli, M. Pilar
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (01) : 280 - 296
  • [2] A Modelling and Tabu Search Heuristic for a Continuous Galvanizing Line Scheduling Problem
    Tang, Lixin
    Gao, Cong
    ISIJ INTERNATIONAL, 2009, 49 (03) : 375 - 384
  • [3] Path bridging: A novel local search methodology for optimizing scheduling in highly constrained continuous galvanizing line operations
    Alvarez-Garcia, Segundo
    Alvarez-Gil, Nicolas
    Rosillo, Rafael
    EXPERT SYSTEMS WITH APPLICATIONS, 2025, 276
  • [4] Advanced Electric Drive Control System of Continuous Hot-Dip Galvanizing Line
    Kornilov, Gennady P.
    Abdulveleev, Ildar R.
    Khramshin, Timur R.
    Shokhin, Valery V.
    2020 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, APPLICATIONS AND MANUFACTURING (ICIEAM), 2020,
  • [5] An effective graph-analysis method to schedule a continuous galvanizing line with campaigning boundary constraints
    Alvarez-Garcia, Segundo
    Alvarez-Gil, Nicolas
    Rosillo, Rafael
    de la Fuente, David
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 192
  • [6] On-line Scheduling in Multiprocessor Systems based on continuous control using Timed Continuous Petri Nets
    Desirena-Lopez, G.
    Vazquez, C. R.
    Briz, J. L.
    Ramirez-Trevino, A.
    Gomez-Gutierrez, D.
    2016 13TH INTERNATIONAL WORKSHOP ON DISCRETE EVENT SYSTEMS (WODES), 2016, : 278 - 283
  • [7] Hierarchical Petri net model and its application for scheduling of semiconductor production line
    Qiao, F
    Li, L
    Wang, ZT
    Wu, QD
    Image Processing, Biomedicine, Multimedia, Financial Engineering and Manufacturing, Vol 18, 2004, 18 : 347 - 352
  • [8] An efficient optimal solution to the coil sequencing problem in electro-galvanizing line
    Tang, Lixin
    Yang, Yang
    Liu, Jiyin
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (10) : 1780 - 1796
  • [9] Slab scheduling at parallel continuous casters
    Wichmann, Matthias Gerhard
    Spengler, Thomas Stefan
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 170 : 551 - 562
  • [10] Add-on Harmonic Disturbance Cancellation Control in Continuous Hot-Dip Galvanizing Lines
    Marko, L.
    Kugi, A.
    Steinboeck, A.
    IFAC PAPERSONLINE, 2023, 56 (02): : 6181 - +