Lessons Learned from the Damaged Huilan Interchange in the 2008 Wenchuan Earthquake

被引:40
作者
Sun, Zhiguo [1 ]
Wang, Dongsheng [1 ]
Guo, Xun [2 ]
Si, Bingjun [3 ]
Huo, Yi [1 ]
机构
[1] Dalian Maritime Univ, Inst Rd & Bridge Engn, Dalian 116026, Peoples R China
[2] China Earthquake Adm, Inst Engn Mech, Harbin 150080, Peoples R China
[3] Dalian Univ Technol, Sch Civil & Hydraul Engn, Dalian 116024, Peoples R China
基金
中国国家自然科学基金;
关键词
Highway bridges; Curvature; Interchanges; Earthquakes; Seismic analysis; Shear failures; Piers; China; Curved bridge; Huilan interchange; Wenchuan earthquake; Post-earthquake investigation; Flexural-shear failure of the pier; CONCRETE COLUMNS;
D O I
10.1061/(ASCE)BE.1943-5592.0000210
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A disastrous earthquake struck Wenchuan in China's Sichuan province in 2008 and caused heavy casualties and structural damage to bridges and buildings. One of the two severely earthquake-damaged curved bridges in China, the Huilan interchange, had been carefully studied, including postearthquake investigation and identification of the cause of failure for this bridge. The Huilan interchange, constructed in 2004 in Mianzhu City, consisted of a viaduct and four horizontally circular ramp bridges with continuous box girders. Field investigations found that the seismic damage to the ramp bridges was especially heavy, one or two short piers in all, but one of the ramp bridges experienced severe failure, and the box girders over the failed piers were fractured. Other piers of the ramp bridges suffered minor-to-moderate damage, including concrete cover spalling, concrete cracking, and slippage damage of the rubber bearings. The viaduct suffered only slight damage, including slippage damage of the rubber bearings and pounding damage of the superstructure. The seismic performance of the bridge was evaluated by finite-element modeling and compared with field observations. It was found that the bearing on top of the shortest pier, Pier 1, was damaged first. Then, the seismic action was concentrated on the next shortest pier, Pier 2, which had the largest flexural stiffness. Pier 2 first yielded in flexure, and, as the lateral displacement increased, the ultimate response of this pier was dominated by its shear capacity, and it eventually failed in flexure-shear mode. DOI: 10.1061/(ASCE)BE.1943-5592.0000210. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:15 / 24
页数:10
相关论文
共 12 条
  • [1] [Anonymous], GUID SEISM DES HIGHW
  • [2] [Anonymous], 2004, LRFD BRIDG DES SPEC
  • [3] ANALYSIS OF THE FAILURE OF INTERSTATE-10 FREEWAY RAMP DURING THE NORTHRIDGE EARTHQUAKE OF 17-JANUARY-1994
    BRODERICK, BM
    ELNASHAI, AS
    [J]. EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1995, 24 (02) : 189 - 208
  • [4] California DOT (Caltrans), 2001, SEISM DES CRIT VERS
  • [5] Fenves G.L., 1998, 9808 PEER U CAL
  • [6] Habibullah A., 1996, SAP2000 US MAN
  • [7] Jaradat OA, 1999, ACI STRUCT J, V96, P57
  • [8] Reconnaissance Report on Damage of Bridges in 2008 Wenchuan, China, Earthquake
    Kawashima, Kazuhiko
    Takahashi, Yoshikazu
    Ge, Hanbin
    Wu, Zhishen
    Zhang, Jiandong
    [J]. JOURNAL OF EARTHQUAKE ENGINEERING, 2009, 13 (07) : 965 - 996
  • [9] PARK R, 1982, J STRUCT DIV-ASCE, V108, P929
  • [10] SEISMIC SHEAR-STRENGTH OF REINFORCED-CONCRETE COLUMNS
    PRIESTLEY, MJN
    VERMA, R
    XIAO, Y
    [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1994, 120 (08): : 2310 - 2327