Integrated scheduling of a multi-product multi-factory manufacturing system with maritime transport limits

被引:36
|
作者
Sun, X. T. [1 ]
Chung, S. H. [1 ]
Chan, Felix T. S. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
Multi-factory manufacturing system; Due date; Maritime transport; Mixed-integer programming; Genetic algorithm; Fuzzy logic; SUPPLY CHAIN; GENETIC ALGORITHM; PRODUCTION NETWORKS; COMPLETION-TIME; BATCH DELIVERY; OPTIMIZATION; COORDINATION; CONSTRAINTS; MACHINE; DATES;
D O I
10.1016/j.tre.2015.04.002
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper studies a practical multi-factory job allocation and scheduling problem involving inland and maritime transport limits. A new heuristic called Due-date Based Cut-off rule (DBC) is developed to improve the computational efficiency of both exact and genetic algorithms (GA). Except the application of DBC, this proposed GA is guided by a novel fuzzy controller aimed at eliminating the drawbacks other GAs have when dealing with multi-factory models. The tests of the solution quality and computational efficiency for this GA are carried out. The numerical experiments demonstrate the value of the proposed approach in this practical global supply chain. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:110 / 127
页数:18
相关论文
共 50 条
  • [1] A survey of multi-factory scheduling
    Behnamian, J.
    Ghomi, S. M. T. Fatemi
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (01) : 231 - 249
  • [2] A survey of multi-factory scheduling
    J. Behnamian
    S. M. T. Fatemi Ghomi
    Journal of Intelligent Manufacturing, 2016, 27 : 231 - 249
  • [3] Multi-factory Cellular Manufacturing Cell Formation and Product Scheduling via Genetic Algorithm
    Wang, Jufeng
    Liu, Chunfeng
    Zhou, MengChu
    2021 IEEE 17TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2021, : 1207 - 1212
  • [4] Multi-objective multi-factory scheduling
    Behnamian, Javad
    Fatemi Ghomi, Seyyed Mohammad Taghi
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (55) : S1447 - S1467
  • [5] Integrated scheduling of a hybrid manufacturing and recovering system in a multi-product multi-stage environment with carbon emission
    Lu, Shan
    Xie, Lei
    Zhu, Li
    Su, Hongye
    JOURNAL OF CLEANER PRODUCTION, 2019, 222 : 695 - 709
  • [6] The multi-product pipeline scheduling system
    MirHassani, S. A.
    Ghorbanalizadeh, M.
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2008, 56 (04) : 891 - 897
  • [7] Multi-factory, Multi-Product Inventory Optimization using Genetic Algorithm for Efficient Supply Chain Management
    Narmadha, S.
    Selladurai, V.
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2009, 9 (12): : 203 - 212
  • [8] MULTI-FACTORY SCHEDULING FOR A CORPORATED SUPPLY CHAIN
    Tahara, Yusaku
    Nagai, Kosuke
    Arima, Sumika
    ACTA TECHNICA NAPOCENSIS SERIES-APPLIED MATHEMATICS MECHANICS AND ENGINEERING, 2023, 66 : 105 - 112
  • [9] Integrated multi-factory production and distribution scheduling applying vehicle routing approach
    Marandi, Fateme
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (03) : 722 - 748
  • [10] SCHEDULING A MULTI-PRODUCT SINGLE MACHINE SYSTEM
    GOYAL, SK
    OPERATIONAL RESEARCH QUARTERLY, 1973, 24 (02) : 261 - 269