Iterated Greedy Algorithms for a Real-World Cyclic Train Scheduling Problem

被引:0
|
作者
Yuan, Zhi [1 ]
Fuegenschuh, Armin [2 ]
Homfeld, Henning [2 ]
Balaprakash, Prasanna [1 ]
Stutzle, Thomas [1 ]
Schoch, Michael [3 ]
机构
[1] Univ Libre Bruxelles, IRIDIA CoDE, Brussels, Belgium
[2] Tech Univ Darmstadt, Fachbereich Math, Arbeitsgruppe Optimierung, Darmstadt, Germany
[3] Deutsche Bahn AG, Frankfurt, Germany
来源
HYBRID METAHEURISTICS, PROCEEDINGS | 2008年 / 5296卷
关键词
D O I
暂无
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
In this paper, we develop heuristic algorithms for a complex locomotive scheduling problem in freight transport that arises at Deutsche Balm AG. While for small instances an approach based on an ILP formulation and its solution by a commercial ILP solver was rather successful, it was found that effective heuristic algorithms are needed for providing better initial upper bounds and for tackling large instances. The main contribution of this paper is the development of heuristic algorithms that strongly improve over the performance of the greedy algorithm used in the previous research efforts. The development process was done on a step-by-step basis ranging from improvements over the initial greedy construction heuristic, the development of a simple local search algorithm, the further extension to an iterated greedy procedure to the adoption of population-based stochastic local search methods. Our computational results show that the iterated greedy algorithm combined with a simple local search is a powerful algorithm for this real-world freight train scheduling problem.
引用
收藏
页码:102 / +
页数:2
相关论文
共 50 条
  • [21] Improved iterated greedy algorithm for reentrant flow shop scheduling problem
    Wu, Xiuli
    Li, Yuxin
    Kuang, Yuan
    Cui, Jianjie
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (07): : 2364 - 2380
  • [22] An improved iterated greedy algorithm for the distributed hybrid flowshop scheduling problem
    Lu, Chao
    Zheng, Jun
    Yin, Lvjiang
    Wang, Renyi
    ENGINEERING OPTIMIZATION, 2024, 56 (05) : 792 - 810
  • [23] A Modified Iterated Greedy Algorithm for Flexible Job Shop Scheduling Problem
    Al Aqel, Ghiath
    Li, Xinyu
    Gao, Liang
    CHINESE JOURNAL OF MECHANICAL ENGINEERING, 2019, 32 (01)
  • [24] A modified iterated greedy algorithm for distributed flowshop group scheduling problem
    Wang, Yuhang
    Han, Yuyan
    Zhang, Chenyao
    Li, Chengshuai
    Wang, Yong
    2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 7 - 12
  • [25] A tabu search tutorial based on a real-world scheduling problem
    Schneider, Ulrike
    CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2011, 19 (04) : 467 - 493
  • [26] A tabu search tutorial based on a real-world scheduling problem
    Ulrike Schneider
    Central European Journal of Operations Research, 2011, 19 : 467 - 493
  • [27] Optimal Solutions to a Real-World Integrated Airline Scheduling Problem
    Cacchiani, Valentina
    Salazar-Gonzalez, Juan-Jose
    TRANSPORTATION SCIENCE, 2017, 51 (01) : 250 - 268
  • [28] Solving a real-world Locomotive Scheduling Problem with Maintenance Constraints
    Frisch, Sarah
    Hungerlaender, Philipp
    Jellen, Anna
    Primas, Bernhard
    Steininger, Sebastian
    Weinberger, Dominic
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2021, 150 : 386 - 409
  • [29] Iterated greedy algorithms for the hybrid flowshop scheduling with total flow time minimization
    Oztop, Hande
    Tasgetiren, M. Fatih
    Eliiyi, Deniz Tursel
    Pan, Quan-Ke
    GECCO'18: PROCEEDINGS OF THE 2018 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2018, : 379 - 385
  • [30] Case study: problem formulation and solution for a real-world sports scheduling problem
    Wright, M. B.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (04) : 439 - 445