Safety hazard identification on construction projects

被引:329
|
作者
Carter, G
Smith, SD [1 ]
机构
[1] Univ Edinburgh, Sch Engn & Elect, Edinburgh EH9 3JL, Midlothian, Scotland
[2] Univ Edinburgh, Coll Sci & Engn, Edinburgh EH9 3JL, Midlothian, Scotland
关键词
D O I
10.1061/(ASCE)0733-9364(2006)132:2(197)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Hazard identification is fundamental to construction safety management; unidentified hazards present the most unmanageable risks. This paper presents an investigation indicating the current levels of hazard identification on three U.K. construction projects. A maximum of only 6.7% of the method statements analyzed on these projects managed to identify all of the hazards that should have been identified. based upon current knowledge. Maximum hazard identification levels were found to be 0.899 (89.9%) for a construction project within the nuclear industry, 0.728 (72.8%) for a project within the railway industry, and 0.665 (66.5%) for a project within both the railway and general construction industry sector. The results indicate that hazard identification levels are far from ideal. A discussion on the reasons for low hazard identification levels indicates key barriers. This leads to the presentation of an Information Technology (IT) too] for construction project safety management (Total-Safety) and, in particular, a module within Total-Safety designed to help construction personnel develop method statements with improved levels of hazard identification.
引用
收藏
页码:197 / 205
页数:9
相关论文
共 50 条
  • [1] UAS-BIM based Real-time Hazard Identification and Safety Monitoring of Construction Projects
    Alizadehsalehi, Sepehr
    Asnafi, Mahsa
    Yitmen, Ibrahim
    Celik, Tolga
    PROCEEDINGS OF THE 9TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2017, : 22 - 32
  • [2] Identification of Safety Hazards in Highway Construction Projects
    Almaskati, Deema
    Kermanshachi, Sharareh
    Pamidimukkala, Apurva
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2024: PAVEMENTS AND INFRASTRUCTURE SYSTEMS, ICTD 2024, 2024, : 118 - 129
  • [3] Mining safety hazard management collaboration features from large construction projects
    Zhang, Dongcheng
    Qiang, Maoshan
    Jiang, Hanchen
    Huang, Yujie
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2022, 62 (02): : 208 - 214
  • [4] Identification of Safety Risks for High-Performance Sustainable Construction Projects
    Fortunato, Bernard R., III
    Hallowell, Matthew R.
    Behm, Michael
    Dewlaney, Katie
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (04): : 499 - 508
  • [5] Workers' relational identification with supervisors influences safety behaviour in construction projects
    Ashraf, Hassan
    Ali, Alishbah
    Sunindijo, Riza Yosia
    Maqsoom, Ahsen
    Memon, Shoeb Ahmed
    Hassan, Muhammad Usman
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (10) : 5030 - 5051
  • [6] BIM-based fall hazard identification and prevention in construction safety planning
    Zhang, Sijie
    Sulankivi, Kristiina
    Kiviniemi, Markku
    Romo, Ilkka
    Eastman, Charles M.
    Teizer, Jochen
    SAFETY SCIENCE, 2015, 72 : 31 - 45
  • [7] IDENTIFICATION OF IMPORTANT ORGANISATIONAL FACTORS INFLUENCING SAFETY WORK BEHAVIOURS IN CONSTRUCTION PROJECTS
    Jitwasinkul, Bhanupong
    Hadikusumo, Bonaventura H. W.
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2011, 17 (04) : 520 - 528
  • [8] Identification of Key Safety Risk Factors and Coupling Paths in Mega Construction Projects
    Xiang, Pengcheng
    Yang, Yingliu
    Yan, Kesheng
    Jin, Lianghai
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2024, 40 (04)
  • [9] A Research Agenda for Neuroactivities in Construction Safety Knowledge Sharing, Hazard Identification and Decision Making
    Li, Rita Yi Man
    Chau, Kwong Wing
    Lu, Weisheng
    Ho, Daniel Chi Wing
    ADVANCES IN NEUROERGONOMICS AND COGNITIVE ENGINEERING, 2020, 953 : 383 - 389
  • [10] Case-Based Reasoning Approach to Construction Safety Hazard Identification: Adaptation and Utilization
    Goh, Y. M.
    Chua, D. K. H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (02) : 170 - 178