Comparison of SCRUM and KANBAN in the Learning Management System implementation process

被引:2
作者
Granulo, Aida [1 ]
Tanovic, Anel [1 ]
机构
[1] Elektrotehn Fak Sarajevu, Zmaja Bosne Bb, Sarajevo 71000, Bosnia & Herceg
来源
2019 27TH TELECOMMUNICATIONS FORUM (TELFOR 2019) | 2019年
关键词
agile software methodology; KANBAN Learning Management System; SCRUM; velocity; WIP;
D O I
10.1109/telfor48224.2019.8971201
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
Paper represents comparative analysis of SCRUM and Kanban on the example of building a Learning Management System. According to calculations Kanban gave better results when time is not limiting factor and the project would end two months earlier. On the other hand, when it is necessary to carry out detailed monitoring and focus on time Scrum has yielded slightly better results. These results provide guidance that can help decide the method for a particular project.
引用
收藏
页码:640 / 643
页数:4
相关论文
共 7 条
[1]  
Alic D, 2017, 2017 40TH INTERNATIONAL CONVENTION ON INFORMATION AND COMMUNICATION TECHNOLOGY, ELECTRONICS AND MICROELECTRONICS (MIPRO), P527, DOI 10.23919/MIPRO.2017.7973482
[2]  
Ashmore Sondra, 2015, INTRO AGILE METHODS, P1
[3]  
Hammarberg Marcus, 2014, KANBAN ACTION, P47
[4]  
Kniberg H., 2007, SCRUM XP TRENCHES, P1
[5]  
Sims Chris, 2011, ELEMENTS SCRUM, P1
[6]  
Thomas S., 2015, ITS DELIVERY THING
[7]  
WAYE JD, 2013, ESSENTIAL SCRUM PRAC, P1