Uncertain Public R&D Project Portfolio Selection Considering Sectoral Balancing and Project Failure

被引:4
作者
Li, Hongbo [1 ]
Chen, Rui [1 ]
Zhang, Xianchao [2 ]
机构
[1] Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China
[2] Jiaxing Univ, Key Lab Med Elect & Digital Hlth Zhejiang Prov, Jiaxing 314001, Peoples R China
关键词
public R&D project; project portfolio selection; sectoral balancing; project failure; uncertainty; stochastic programming; RESOURCE-ALLOCATION; ALGORITHM; DURATION;
D O I
10.3390/su142315774
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In order to promote scientific and technological innovation and sustainable development, public funding agencies select and fund a large number of R&D projects every year. To guarantee the performance of the resulting project portfolio and the government's investment benefits, the decision maker needs to select appropriate projects and determine a reasonable funding amount for each selected project. In the process of project selection, it is necessary to consider the balance of funding allocated to different scientific sectors as well as the failure probability of the projects in future execution, so that the expected performance of the project portfolio is maximized as much as possible. In view of this, we propose and study the uncertain public R&D project portfolio selection problem considering sectoral balancing and project failure. We formulate a stochastic programming model for the problem to support the portfolio decisions of the funding agencies. We also transform the model into an equivalent deterministic second-order cone programming model that can be directly solved by exact solvers. We generate datasets reflecting different scenarios through simulation and perform computational experiments to validate our model. The impacts of various factors (i.e., the number of project proposals, project failure probability, the upper limit of the budget allocated to each project, and the decision maker's tolerance for project failure) on the project portfolio performance are analyzed.
引用
收藏
页数:13
相关论文
共 36 条
[1]   An Integrated Planning Framework for Sustainable Water and Energy Supply [J].
Ahmadi, Esmaeil ;
McLellan, Benjamin ;
Ogata, Seiichi ;
Mohammadi-Ivatloo, Behnam ;
Tezuka, Tetsuo .
SUSTAINABILITY, 2020, 12 (10)
[2]   Stochastic second-order cone programming: Applications models [J].
Alzalg, Baha M. .
APPLIED MATHEMATICAL MODELLING, 2012, 36 (10) :5122-5134
[3]   Research and development project portfolio selection under uncertainty [J].
Arratia-Martinez, Nancy M. ;
Caballero-Fernandez, Rafael ;
Litvinchev, Igor ;
Lopez-Irarragorri, Fernando .
JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2018, 9 (03) :857-866
[4]   Improving the Results of the Earned Value Management Technique Using Artificial Neural Networks in Construction Projects [J].
Balali, Amirhossein ;
Valipour, Alireza ;
Antucheviciene, Jurgita ;
Saparauskas, Jonas .
SYMMETRY-BASEL, 2020, 12 (10) :1-17
[5]  
Beaujon GJ, 2001, NAV RES LOG, V48, P18, DOI 10.1002/1520-6750(200102)48:1<18::AID-NAV2>3.0.CO
[6]  
2-7
[7]   Impact assessment based sectoral balancing in public R&D project portfolio selection [J].
Caglar, Musa ;
Gurel, Sinan .
SOCIO-ECONOMIC PLANNING SCIENCES, 2019, 66 :68-81
[8]   Public R&D project portfolio selection problem with cancellations [J].
Caglar, Musa ;
Gurel, Sinan .
OR SPECTRUM, 2017, 39 (03) :659-687
[9]  
China.org.cn, CHIN R D INV INT HIT
[10]   Decision Making for Project Appraisal in Uncertain Environments: A Fuzzy-Possibilistic Approach of the Expanded NPV Method [J].
Chrysafis, Konstantinos A. ;
Papadopoulos, Basil K. .
SYMMETRY-BASEL, 2021, 13 (01) :1-24