Stochastic strategic planning of open-pit mines with ore selectivity recourse

被引:4
作者
Navarra, A. [1 ]
Montiel, L. [2 ]
Dimitrakopoulos, R. [2 ]
机构
[1] Univ Catolica Norte, Dept Ind Engn, Antofagasta, Chile
[2] McGill Univ, COSMO Stochast Mine Planning Lab, Montreal, PQ, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Strategic mine planning; open-pit; stochastic optimisation; variable neighbourhood descent; SEARCH; OPERATIONS;
D O I
10.1080/17480930.2016.1201380
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Stochastic mine planning algorithms have been extended to better represent ore selection decisions. Under geological uncertainty, existing algorithms generate plans that may violate the mineral processing capacity; under such geological scenarios, the excess ore undergoes a recourse action which is not as profitable as regular processing, hence decreasing the net present value. This decrease has previously been represented as a penalty on excess ore, which may not accurately represent actual operations. The new framework considers the most typical recourse: increasing the cut-off grade into the mineral process. This approach is demonstrated by adapting the VND algorithm of Lamghari et al.
引用
收藏
页码:1 / 17
页数:17
相关论文
共 29 条
  • [21] An Application of Simultaneous Stochastic Optimization at a Large Open-Pit Gold Mining Complex under Supply Uncertainty
    LaRoche-Boisvert, Melanie
    Dimitrakopoulos, Roussos
    MINERALS, 2021, 11 (02) : 1 - 16
  • [22] A two-stage simultaneous optimization of NPV and throughput in production planning of open pit mines
    Tabesh, Mohammad
    Afrapoli, Ali Moradi
    Askari-Nasab, Hooman
    RESOURCES POLICY, 2023, 80
  • [23] STRESS STATE OF ENTRIES SUPPORT WHEN STOCKS OF ORE MINE VOSTOCHNY ARE DEVELOPING BY COMBINED OPEN-PIT AND UNDERGROUND METHOD
    Protosenya, A. G.
    Kuranov, A. D.
    JOURNAL OF MINING INSTITUTE, 2012, 197 : 151 - 153
  • [24] Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
    Blom, Michelle
    Pearce, Adrian R.
    Stuckey, Peter J.
    ENGINEERING OPTIMIZATION, 2018, 50 (12) : 2143 - 2160
  • [25] A practical approach to open-pit mine planning under price uncertainty using information gap decision theory
    Tahernejad, M. M.
    Ataei, M.
    Khalokakaie, R.
    JOURNAL OF MINING AND ENVIRONMENT, 2018, 9 (02): : 527 - +
  • [26] A stochastic optimization method with in-pit waste and tailings disposal for open pit life-of-mine production planning
    Rimele, M. Adrien
    Dimitrakopoulos, Roussos
    Gamache, Michel
    RESOURCES POLICY, 2018, 57 : 112 - 121
  • [27] Reliability and availability artificial intelligence models for predicting blast-induced ground vibration intensity in open-pit mines to ensure the safety of the surroundings
    Nguyen, Hoang
    Bui, Xuan-Nam
    Topal, Erkan
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 231
  • [28] An ANN-Fuzzy Cognitive Map-Based Z-Number Theory to Predict Flyrock Induced by Blasting in Open-Pit Mines
    Hosseini, Shahab
    Poormirzaee, Rashed
    Hajihassani, Mohsen
    Kalatehjari, Roohollah
    ROCK MECHANICS AND ROCK ENGINEERING, 2022, 55 (07) : 4373 - 4390
  • [29] Machine Learning Algorithms for Data Enrichment: A Promising Solution for Enhancing Accuracy in Predicting Blast-Induced Ground Vibration in Open-Pit Mines
    Nguyen, Hoang
    Bui, Xuan-Nam
    Drebenstedt, Carsten
    INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2023, (02): : 79 - 88