Passive seismic velocity tomography on longwall mining panel based on simultaneous iterative reconstructive technique (SIRT)

被引:39
作者
Hosseini, N. [1 ]
Oraee, K. [2 ]
Shahriar, K. [3 ]
Goshtasbi, K. [4 ]
机构
[1] Islamic Azad Univ, Dept Min Engn, S Tehran Branch, Tehran 1777613651, Iran
[2] Univ Stirling, Dept Management, Stirling FK9 4LA, Scotland
[3] Amirkabir Univ Technol, Dept Min & Met Engn, Tehran 1591634311, Iran
[4] Tarbiat Modares Univ, Dept Min Engn, Tehran 14115111, Iran
关键词
longwall mining; passive seismic velocity tomography; simultaneous iterative reconstructive technique (SIRT); boundary element method; stress redistribution; ground control;
D O I
10.1007/s11771-012-1275-z
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Mining operation, especially underground coal mining, always has the remarkable risks of ground control. Passive seismic velocity tomography based on simultaneous iterative reconstructive technique (SIRT) inversion is used to deduce the stress redistribution around the longwall mining panel. The mining-induced microseismic events were recorded by mounting an array of receivers on the surface, above the active panel. After processing and filtering the seismic data, the three-dimensional tomography images of the p-wave velocity variations by SIRT passive seismic velocity tomography were provided. To display the velocity changes on coal seam level and subsequently to infer the stress redistribution, these three-dimensional tomograms into the coal seam level were sliced. In addition, the boundary element method (BEM) was used to simulate the stress redistribution. The results show that the inferred stresses from the passive seismic tomograms are conformed to numerical models and theoretical concept of the stress redistribution around the longwall panel. In velocity tomograms, the main zones of the stress redistribution around the panel, including front and side abutment pressures, and gob stress are obvious and also the movement of stress zones along the face advancement is evident. Moreover, the effect of the advance rate of the face on the stress redistribution is demonstrated in tomography images. The research result proves that the SIRT passive seismic velocity tomography has an ultimate potential for monitoring the changes of stress redistribution around the longwall mining panel continuously and subsequently to improve safety of mining operations.
引用
收藏
页码:2297 / 2306
页数:10
相关论文
共 20 条
  • [11] Nolet G., 2008, A Breviary of Seismic Tomography, DOI DOI 10.1017/CBO9780511984709
  • [12] Peng S.S., 2006, LONGWALL MINING, V2nd
  • [13] Peng S.S., 2008, COAL MINE GROUND CON, V3rd
  • [14] PEREYRA V, 1993, THEOR PRACT, P9
  • [15] Santamarina J.C., 2005, DISCRETE SIGNALS INV
  • [16] The resolution of whole Earth seismic tomographic models
    Soldati, G
    Boschi, L
    [J]. GEOPHYSICAL JOURNAL INTERNATIONAL, 2005, 161 (01) : 143 - 153
  • [17] Tarantola A., 1987, INVERSE PROBLEM THEO, DOI [10.1016/0031-9201(89)90124-6, DOI 10.1016/0031-9201(89)90124-6]
  • [18] TSELENTIS GA, 2007, GEOPHYS J, V72, P93
  • [19] Watanabe T., 1999, 69th Annual International Meeting, SEG, Expanded Abstracts, P1402, DOI DOI 10.1190/1.1820777
  • [20] SEISMIC CHARACTERIZATION OF A HIGHLY STRESSED ROCK MASS USING TOMOGRAPHIC IMAGING AND INDUCED SEISMICITY
    YOUNG, RP
    MAXWELL, SC
    [J]. JOURNAL OF GEOPHYSICAL RESEARCH-SOLID EARTH, 1992, 97 (B9) : 12361 - 12373