Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm

被引:0
|
作者
Huang, Yuan-Sheng [1 ]
Deng, Jia-Jia [1 ]
Zang, Yun-Yun [1 ]
机构
[1] N China Elect Power Univ, Dept Econ & Management, Baoding 071003, Peoples R China
关键词
time-cost-quality; tradeoff optimization; multi-attribute utility function; ant colony algorithm;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
How to balance time, cost and quality is crucial to construction project management. Tradeoff optimization among them is significant for the improvement of the overall benefits of construction projects. Based on inter-related linear programming functions, a model of multi-attribute utility function is established to study the tradeoff among time, cost and quality. Critical path method (CPM) and ant colony algorithm based on modified selection strategy and global pheromone are applied to obtain the optimal decision result. At last, a case study on heavy repair of instrument control system for hot blast stove is given to verify the feasibility and practicability of the model.
引用
收藏
页码:1031 / 1035
页数:5
相关论文
共 50 条
  • [41] A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects
    Nguyen, Dang-Trinh
    Doan, Dinh-Thien-Vuong
    Tran, Nguyen-Ngoc Cuong
    Tran, Duc-Hoc
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (05) : 843 - 854
  • [42] Applying Self-adaptive Ant Colony Optimization for Construction Time-Cost Optimization
    Li Hui-min
    Wang Zhuo-fu
    2009 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (16TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2009, : 283 - 289
  • [43] A modified ant colony optimization algorithm for dynamic topology optimization
    Yoo, Kwang-Seon
    Han, Seog-Young
    COMPUTERS & STRUCTURES, 2013, 123 : 68 - 78
  • [44] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [45] The Application of Ant Colony Optimization in Investment Scheme of Construction Project
    Xie Na
    Zhang Hong
    PROCEEDINGS OF CRIOCM 2008 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCES OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2008, : 233 - 237
  • [46] Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm
    Nguyen, Dang-Trinh
    Le-Hoai, Long
    Tarigan, Putri Basenda
    Tran, Duc-Hoc
    ALEXANDRIA ENGINEERING JOURNAL, 2022, 61 (02) : 1499 - 1518
  • [47] Streamlined project time-cost tradeoff optimization methodology: Algorithm, automation, and application
    Nasiri, Sasan
    Lu, Ming
    AUTOMATION IN CONSTRUCTION, 2022, 133
  • [48] Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm
    Khazaeni, Garshasb
    Khazaeni, Ali
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2024,
  • [49] Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study
    Sorrentino, Mariarosa
    IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 163 - 176
  • [50] Modified Streamlined Optimization Algorithm for Time-Cost Tradeoff Problems of Complex Large-Scale Construction Projects
    Wang, Jia
    Han, Congji
    Li, Xinghua
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (05)