Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm

被引:0
|
作者
Huang, Yuan-Sheng [1 ]
Deng, Jia-Jia [1 ]
Zang, Yun-Yun [1 ]
机构
[1] N China Elect Power Univ, Dept Econ & Management, Baoding 071003, Peoples R China
关键词
time-cost-quality; tradeoff optimization; multi-attribute utility function; ant colony algorithm;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
How to balance time, cost and quality is crucial to construction project management. Tradeoff optimization among them is significant for the improvement of the overall benefits of construction projects. Based on inter-related linear programming functions, a model of multi-attribute utility function is established to study the tradeoff among time, cost and quality. Critical path method (CPM) and ant colony algorithm based on modified selection strategy and global pheromone are applied to obtain the optimal decision result. At last, a case study on heavy repair of instrument control system for hot blast stove is given to verify the feasibility and practicability of the model.
引用
收藏
页码:1031 / 1035
页数:5
相关论文
共 50 条
  • [21] Modified Algorithm for Phylogenetic Tree Construction using Ant Colony Optimization
    Perera, W. A. R. D.
    Wannige, C. T.
    2019 19TH INTERNATIONAL CONFERENCE ON ADVANCES IN ICT FOR EMERGING REGIONS (ICTER - 2019), 2019,
  • [22] Optimizing construction time and cost using ant colony optimization approach
    Ng, S. Thomas
    Zhang, Yanshuai
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (09) : 721 - 728
  • [23] Multi-objective Stochastic Time-cost-quality Optimization for Construction Projects Based on the Reliability Theory
    Wang, Jingjing
    Wang, Zongxi
    Liu, Huimin
    KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (11) : 4545 - 4556
  • [24] Time-cost-quality tradeoff considering resource-scheduling problems
    Elkliny, Ali F.
    Sanad, Haytham M.
    Etman, Emad E.
    AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (11)
  • [25] Time-Cost-Quality Risk Elements Transmission Equilibrium Optimization of Wind Power Project Based on SAPSO
    Liu, Jicheng
    Chang, Hao
    Wang, Suhua
    2014 INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT, 2014, : 669 - 673
  • [26] The dialectical relationship of time-cost-quality in whole life cycle construction project management
    Li, W
    Cai, SQ
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 267 - 270
  • [27] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
  • [28] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution
    Zhang, Lianying
    Yue, Yan
    Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
  • [29] Multi-objective Stochastic Time-cost-quality Optimization for Construction Projects Based on the Reliability Theory
    Jingjing Wang
    Zongxi Wang
    Huimin Liu
    KSCE Journal of Civil Engineering, 2023, 27 : 4545 - 4556
  • [30] Choose the Best Project Based on Simulation Optimization and Ant Colony Optimization Algorithm
    Feili, Hamid Reza
    Farsi, Alireza
    Nobahari, Niloofar
    JOURNAL OF MATHEMATICS AND COMPUTER SCIENCE-JMCS, 2013, 7 (02): : 101 - 111