Ti time-cost-quality tradeoff optimization in construction project based on modified ant colony algorithm

被引:0
|
作者
Huang, Yuan-Sheng [1 ]
Deng, Jia-Jia [1 ]
Zang, Yun-Yun [1 ]
机构
[1] N China Elect Power Univ, Dept Econ & Management, Baoding 071003, Peoples R China
关键词
time-cost-quality; tradeoff optimization; multi-attribute utility function; ant colony algorithm;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
How to balance time, cost and quality is crucial to construction project management. Tradeoff optimization among them is significant for the improvement of the overall benefits of construction projects. Based on inter-related linear programming functions, a model of multi-attribute utility function is established to study the tradeoff among time, cost and quality. Critical path method (CPM) and ant colony algorithm based on modified selection strategy and global pheromone are applied to obtain the optimal decision result. At last, a case study on heavy repair of instrument control system for hot blast stove is given to verify the feasibility and practicability of the model.
引用
收藏
页码:1031 / 1035
页数:5
相关论文
共 50 条
  • [1] Fuzzy tradeoff optimization of time-cost-quality in construction project
    Management School, Xi'an Jiaotong University, Xi'an 710049, China
    Xitong Gongcheng Lilum yu Shijian, 2006, 7 (112-117):
  • [2] Application of Time-Cost-Quality Tradeoff Optimization Model Based on Improved PSO Algorithm to Construction Project
    Yang, Qin
    2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 2, PROCEEDINGS, 2009, : 298 - 301
  • [3] A New Approach to Time-Cost-Quality Tradeoff Problem for Construction Project
    Fu Fang
    Zhang Chao
    2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (ICMSE), 2014, : 1836 - 1842
  • [4] An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation
    Hu, Wenfa
    He, Xinhua
    SCIENTIFIC WORLD JOURNAL, 2014,
  • [5] Research on Integrated Optimization of Time-cost-quality of Engineering Project Based on Genetic Algorithm
    Liu, Qiang
    Yang, Chunyan
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 1300 - 1304
  • [6] Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction
    Zhang, Hong
    Xing, Feng
    AUTOMATION IN CONSTRUCTION, 2010, 19 (08) : 1067 - 1075
  • [7] Research on Optimization of Project Time-Cost-Quality Based on Particle Swarm Optimization
    Song, Yanqing
    Hou, Genran
    INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND SUPPLY CHAIN MANAGEMENT, 2019, 12 (02) : 76 - 88
  • [8] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
  • [9] A Stochastic Time-cost-quality Tradeoff Model for Discrete Project Scheduling Problem
    Ma, Wei-Min
    Liu, Qing-Hai
    Ke, Hua
    PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND MANAGEMENT INNOVATION, 2014, : 318 - 323
  • [10] Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring
    Zhong, Deng-hua
    Hu, Wei
    Wu, Bin-ping
    Li, Zheng
    Zhang, Jun
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2017, 18 (01): : 1 - 19