Generic simulation model for hybrid flow-shop

被引:16
作者
Grangeon, N [1 ]
Tanguy, A [1 ]
Tchernev, N [1 ]
机构
[1] Univ Clermont Ferrand 2, LIMOS, F-63177 Aubiere, France
关键词
hybrid mow-shop; object-oriented modelling; object-oriented simulation; performance evaluation;
D O I
10.1016/S0360-8352(99)00056-X
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we propose a generic simulation model for Hybrid Flow-Shop (HFS) where the job priorities at each machine stage are established dynamically. Based on an object-oriented conceptual model of the HFS system class, an initial dynamic simulation prototype was developed using the Simula language and the external class GPSSS (GPSS under Simula). In order to help the industrial managers an HFS dedicated simulator in Delphi 2 under Windows 95 operating system has been realized. The main goal of the simulator is to facilitate the performance evaluation of different priority rules for job dispatching concerning the mean flow time and makespan as well as other performance criteria like average resource utilization, average queue length... A simulation experiment was made to investigate the performance of four priority rules. The performed tests concern 13 systems. The results of 52 simulation runs demonstrate that the SPT dispatching rule yielded superior performance for the makespan criteria for the most of tests. However, it has also been found that for Some tests clear superiority of a particular priority rule has not been established. Thus the HFS simulator proposed can help managers to schedule hybrid flow shops efficiently to achieve various corporate objectives. (C) 1999 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:207 / 210
页数:4
相关论文
共 19 条
[1]  
Aghezzaf E. A., 1995, INT C IND ENG PROD M, P43
[2]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[3]   BRANCH AND BOUND ALGORITHM FOR THE FLOW-SHOP WITH MULTIPLE PROCESSORS [J].
BRAH, SA ;
HUNSUCKER, JL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :88-99
[4]   SURVEY OF SCHEDULING RESEARCH INVOLVING DUE DATE DETERMINATION DECISIONS [J].
CHENG, TCE ;
GUPTA, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) :156-166
[5]  
CHEVALIER G, 1996, REV VERRE, V2, P27
[6]  
FORTEMPS P, 1996, IN PRESS EUR J OP RE
[7]   A computational study of heuristics for two-stage flexible flowshops [J].
Guinet, A ;
Solomon, MM ;
Kedia, PK ;
Dussauchoy, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (05) :1399-1415
[8]   SCHEDULES FOR A 2-STAGE HYBRID FLOWSHOP WITH PARALLEL MACHINES AT THE 2ND STAGE [J].
GUPTA, JND ;
TUNC, EA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) :1489-1502
[9]   COMPARATIVE PERFORMANCE ANALYSIS OF PRIORITY RULES IN A CONSTRAINED FLOW-SHOP WITH MULTIPLE PROCESSORS ENVIRONMENT [J].
HUNSUCKER, JL ;
SHAH, JR .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 72 (01) :102-114
[10]   A hybrid two-stage flowshop with part family, batch production, major and minor set-ups [J].
Li, SL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 102 (01) :142-156