Robust Scheduling, a Production Scheduling Model of Failures

被引:10
作者
Paprocka, Iwona [1 ]
Skolud, Bozena [1 ]
机构
[1] Silesian Tech Univ, Inst Engn Proc Automat & Integrated Mfg Syst, PL-44100 Gliwice, Poland
来源
MECHATRONICS AND COMPUTATIONAL MECHANICS | 2013年 / 307卷
关键词
predictive scheduling; robust schedule; Mean Time To First Failure (MTTFF); immune algorithm; normal distribution; multiobjective scheduling;
D O I
10.4028/www.scientific.net/AMM.307.443
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In the paper a production model with failures is presented where successive failure-free times are supposed to have normal distributions and are followed by normally distributed times of repairs. Unknown parameters of the distribution are estimated using e.g. empirical moments approach. Predictions of unknown parameters are done using classical regression method. Having Mean Time To First Failure, and Mean Time of Repair a disturbance robust predictive schedule is generated using an immune algorithm and rule Minimal Impact of Disturbed Operation on the Schedule.
引用
收藏
页码:443 / 446
页数:4
相关论文
共 7 条
[1]   An approach to predictive-reactive scheduling of parallel machines subject to disruptions [J].
Duenas, Alejandra ;
Petrovic, Dobrila .
ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) :65-82
[2]   An anticipative scheduling approach with controllable processing times [J].
Gurel, Sinan ;
Korpeoglu, Ersin ;
Akturk, M. Selim .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (06) :1002-1013
[3]  
Herroelen W, 2004, INT J PROD RES, V42, P1599, DOI [10.1080/00207540310001638055, 10.1080/00207543310001638055]
[4]  
Kalinowski K., 2009, FLEXIBLE AUTOMATION, P85
[5]  
Kempa W, 2011, MANAGEMENT CONTROL M, P7
[6]  
Skolud B., 2008, FAIM2008 SKOVD SWED, P738
[7]  
Skolud B, 2009, 30 INT C INF SYST AR, P217