Estimating downtime in loss modeling

被引:116
作者
Comerio, MC [1 ]
机构
[1] Univ Calif Berkeley, Dept Architecture, Berkeley, CA 94720 USA
关键词
D O I
10.1193/1.2191017
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Downtime includes the time necessary to plan, finance, and complete repairs on facilities damaged in earthquakes or other disasters. It is an essential component of loss modeling, because it is one measure of operational failure in lifelines and business interruption in buildings. Data from building repairs after the Loma Prieta and Northridge earthquakes, together with institutional risk management projections are used to define the rational and irrational components of downtime for buildings. Rational components include construction costs and time. Irrational situation-specific components take into account the time needed to mobilize for repairs and include financing, relocation of functions, workforce availability, regulatory changes, and economic uncertainty. To quantity these factors, the pace of recovery call be linked to the scale of damage in a stock of buildings in the affected region.
引用
收藏
页码:349 / 365
页数:17
相关论文
共 32 条
[1]  
Alesch D.J., 2001, Organizations at risk: What happens when small businesses and not-for-profits encounter natural disasters
[2]  
Algermissen S.T., 1973, STUDY EARTHQUAKE LOS
[3]  
[Anonymous], 1972, STUDY EARTHQUAKE LOS
[4]  
[Anonymous], ENV HAZARDS
[5]  
[Anonymous], EARTHQUAKE ENG ENG S
[6]  
ASLANI H, 2002, P 7 US NAT C EARTHQ
[7]  
BENDIMERAD F, 2004, COMMUNICATION
[8]  
Comerio MC, 2000, EC BENEFITS DISASTER
[9]  
COMERIO MC, 1996, RES PUBLICATION CEDR, V1496
[10]  
COMERIO MC, 1996, CAL POL SEM U CAL BE