Flow shop scheduling with deteriorating jobs under dominating machines

被引:71
作者
Wang, JB [1 ]
Xia, ZQ
机构
[1] Shenyang Inst Aeronaut Engn, Dept Sci, Shenyang 110034, Peoples R China
[2] Dalian Univ Technol, Dept Appl Math, Dalian 116024, Peoples R China
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2006年 / 34卷 / 04期
关键词
scheduling; flow shop; simple linear deterioration; dominating machines;
D O I
10.1016/j.omega.2004.10.006
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses no-wait or no-idle flow shop scheduling problems with deteriorating jobs, i.e., jobs whose processing times are an increasing function of their starting time. A simple linear deterioration function is assumed and some dominating relationships between machines can be satisfied. It is shown that for the problems to minimize makespan or weighted sum of completion time, polynomial algorithms still exist, although these problems are more complicated than the classical ones. When the objective is to minimize maximum lateness or maximum tardiness, the solutions of a classical version may not hold. (c) 2005 Elsevier Ltd. All rights reserved.
引用
收藏
页码:327 / 336
页数:10
相关论文
共 27 条
[1]   FLOWSHOP NO-IDLE OR NO-WAIT SCHEDULING TO MINIMIZE THE SUM OF COMPLETION TIMES [J].
ADIRI, I ;
POHORYLES, D .
NAVAL RESEARCH LOGISTICS, 1982, 29 (03) :495-504
[2]   Scheduling with time dependent processing times: Review and extensions [J].
Alidaee, B ;
Womer, NK .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1999, 50 (07) :711-720
[3]   Minimizing maximum lateness under linear deterioration [J].
Bachman, A ;
Janiak, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 126 (03) :557-566
[4]  
Bachman A, 2002, OPERAT RES PROCEED, P265
[5]   Minimizing the total weighted completion time of deteriorating jobs [J].
Bachman, A ;
Janiak, A ;
Kovalyov, MY .
INFORMATION PROCESSING LETTERS, 2002, 81 (02) :81-84
[6]  
Bachman A, 2000, OPERATIONS RESEARCH PROCEEDINGS 1999, P342
[7]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[8]   SCHEDULING DETERIORATING JOBS ON A SINGLE PROCESSOR [J].
BROWNE, S ;
YECHIALI, U .
OPERATIONS RESEARCH, 1990, 38 (03) :495-498
[9]   Nonpreemptive flowshop scheduling with machine dominance [J].
Cepek, O ;
Okada, M ;
Vlach, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 139 (02) :245-261
[10]   Parallel machine scheduling with time dependent processing times [J].
Chen, ZL .
DISCRETE APPLIED MATHEMATICS, 1996, 70 (01) :81-93