Modeling and investigation start-up procedures of a combined cycle power plant

被引:114
|
作者
Alobaid, Falah [1 ]
Postler, Ralf [1 ]
Stroehle, Jochen [1 ]
Epple, Bernd [1 ]
Kim Hyun-Gee [2 ]
机构
[1] Tech Univ Darmstadt, D-64287 Darmstadt, Germany
[2] Boiler Syst Dev Team, DOOSAN Heavy Ind & Construct, Chang Won, South Korea
关键词
heat recovery steam generator; control circuit; dynamic simulation; start-up improvement;
D O I
10.1016/j.apenergy.2008.03.003
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This study describes the particular development and investigation of a static and dynamic simulation model and its application to improve the start-up process of a combined cycle power plant. Generally, the power plant system and control design mean highly complex interactivities. The dynamic simulation models using powerful computers are effective tools for studying and understanding the operating characteristics of power plants to meet and improve the design, control strategy and operational requirements. The heat recovery steam generator (HRSG) is modeled by using commercial simulation software named advanced process simulation software (APROS). The HRSG model includes an advanced control philosophy and turbine bypass systems to have a high level of accuracy, especially during hard transients. The comparison between the simulation results and measured data is documented. The received results proved and embodied that the simulation is both very reliable to estimate the real HRSG dynamic behaviour and capable to predict the operational processes. Through a parametric study, the start-up time will be reduced while keeping the life-time consumption of critically stressed components under control. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1173 / 1189
页数:17
相关论文
共 50 条
  • [1] Optimization of the start-up procedure of a combined cycle power plant
    Albanesi, C.
    Bossi, M.
    Magni, L.
    Paderno, J.
    Pretolani, R.
    Kuehl, P.
    Diehl, M.
    PROCEEDINGS OF THE 45TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2006, : 1841 - +
  • [2] Optimization of start-up process in combined cycle steam turbine of a power plant
    Ding, Y. (dyj1987214@126.com), 1600, Chinese Society for Electrical Engineering (33):
  • [3] Dynamic optimization method for start-up scheduling of a combined cycle power plant
    Shirakawa, Masakazu
    Nakamoto, Masashi
    Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 2002, 68 (672): : 2377 - 2384
  • [4] Start-Up Optimisation of a Combined Cycle Power Plant with Multiobjective Evolutionary Algorithms
    Bertini, Ilaria
    De Felice, Matteo
    Moretti, Fabio
    Pizzuti, Stefano
    APPLICATIONS OF EVOLUTIONARY COMPUTATION, PT II, PROCEEDINGS, 2010, 6025 : 151 - 160
  • [5] Start-Up Optimization of Combined Cycle Power Plants: A Field Test in a Commercial Power Plant
    Yoshida, Yasuhiro
    Yoshida, Takuya
    Enomoto, Yuki
    Osaki, Nobuhiro
    Nagahama, Yoshito
    Tsuge, Yoshifumi
    JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (03):
  • [6] Multi-objective evaluation method for combined cycle power plant start-up
    Shirakawa, Masakazu
    Arakawa, Masao
    IFAC JOURNAL OF SYSTEMS AND CONTROL, 2020, 13
  • [7] Multi-objective Evaluation Method for Combined Cycle Power Plant Start-up
    Shirakawa, Masakazu
    Arakawa, Masao
    IFAC PAPERSONLINE, 2018, 51 (28): : 19 - 24
  • [8] COMBINED-CYCLE START-UP PROCEDURES: DYNAMIC SIMULATION AND MEASUREMENT
    Mertens, Nicolas J.
    Alobaid, Falah
    Epple, Bernd
    Kim, Hyun-Gee
    PROCEEDINGS OF THE ASME POWER CONFERENCE, 2016, 2016,
  • [9] Start-up improvement of a supplementary-fired large combined-cycle power plant
    Alobaid, Falah
    JOURNAL OF PROCESS CONTROL, 2018, 64 : 71 - 88
  • [10] ASPEN dynamics simulation for combined cycle power - plant Validation with hot start-up measurement
    Sabia, Gabriele
    Heinze, Christian
    Alobaid, Falah
    Martelli, Emanuele
    Epple, Bernd
    ENERGY, 2019, 187