共 24 条
- [1] ADACHI T, 1989, NUMERICAL MODELS GEO, V3, P691
- [2] STABILITY OF A SHALLOW CIRCULAR TUNNEL IN COHESIONLESS SOIL [J]. GEOTECHNIQUE, 1977, 27 (02): : 203 - 215
- [4] Difference between load-transfer relationships for laterally loaded pile groups: Active p-y or passive p-delta [J]. JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1996, 122 (12): : 1015 - 1018
- [5] CHAOUI F, 1994, P 8 INT C COMP METH, V3, P2297
- [7] Chen L., 1994, Proceedings, The 8th International Conference on Computer Methods and Advances in Geomechanics, V3, P2311
- [8] *COMM GLOSS TERMS, 1958, J SOIL MECH FDN DIV, V84, P1
- [9] Cundall P., 1992, Eng Comput, V9, P101, DOI [DOI 10.1108/EB023851, 10.1108/eb023851]
- [10] THE ARCH IN SOIL ARCHING [J]. JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1985, 111 (03): : 302 - 318