Resource Constrained Project Scheduling by Harmony Search Algorithm

被引:22
作者
Giran, Omer [1 ]
Temur, Rasim [1 ]
Bekdas, Gebrail [1 ]
机构
[1] Istanbul Univ, Dept Civil Engn, Istanbul, Turkey
关键词
construction management; resource leveling; harmony search; optimization; scheduling; OPTIMIZATION; CONSTRUCTION;
D O I
10.1007/s12205-017-1363-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry is nonhomogeneous and also managing construction projects are more difficult in today's world. Construction projects are huge and contractors want to accomplish them within a short time in this fast changing era. Therefore, the time and resource have to be managed for a successful construction project management. Resource leveling is one of the primary tools used for managing resources. The target is leveling the resources within a minimum time period to complete the project successfully. Resource constrained project scheduling problems (RCPSP) are a Non-deterministic Polynomial-time hard (NP-hard) problem therefore heuristic methods can be used to solve it. This paper presents a harmony search method for solving the RCPSP. In order to compare the performance of the developed software three examples were chosen from the literature. Computational results indicate that the harmony search method is more effective, rapid and suitable for the RCPSP than existing solutions.
引用
收藏
页码:479 / 487
页数:9
相关论文
共 46 条
[1]  
Afshar A., 2010, 2 INT C ENG OPT CD R, p[1134, 1]
[2]  
AMMAR MA, 2002, CONSTRUCTION MANAGEM, V20, P323, DOI DOI 10.1080/01446190210131098
[3]   LOB and CPM Integrated Method for Scheduling Repetitive Projects [J].
Ammar, Mohammad A. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) :44-50
[4]   Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic [J].
Anagnostopoulos, Konstantinos ;
Koulinas, Georgios .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (02) :204-213
[5]  
[Anonymous], PROJ MAN BOD KNOWL P
[6]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[7]   Construction resource scheduling with genetic algorithms [J].
Chan, WT ;
Chua, DKH ;
Kannan, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02) :125-132
[8]   Minimum Moment Method for Resource Leveling Using Entropy Maximization [J].
Christodoulou, Symeon E. ;
Ellinas, Georgios ;
Michaelidou-Kamenou, Anastasia .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) :518-527
[9]   Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents [J].
Christodoulou, Symeon M. .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2010, 24 (01) :45-55
[10]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH [J].
CHRISTOFIDES, N ;
ALVAREZVALDES, R ;
TAMARIT, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) :262-273