Revenue management approach to due date quoting and scheduling in an assemble-to-order production system

被引:20
作者
Guhlich, Hendrik [1 ]
Fleischmann, Moritz [1 ]
Stolletz, Raik [1 ]
机构
[1] Univ Mannheim, D-68131 Mannheim, Germany
关键词
Revenue management; Due date quoting; Assemble-to-order; Assembly capacity; Scarce input materials; INVENTORY CONTROL; PROMISE; OPERATIONS; DEMAND; MODEL;
D O I
10.1007/s00291-015-0401-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider demand management decisions for an assemble-to-order production system in which both the availability of intermediate material and assembly capacity are limited. For each incoming order, the manufacturer must decide whether to accept it and what due date to quote for an accepted order. The actual assembly dates are still subject to change after these decisions, and a production schedule must be maintained to guarantee that the quoted due dates are met. Therefore, the decisions on accepting orders and quoting due dates must be made with incomplete knowledge of the actual resources used to fulfill the orders. To address these factors, we model this situation and develop a novel revenue management approach using bid prices. An extensive numerical study demonstrates the good performance of the proposed approach in comparison with benchmark algorithms and an ex-post optimal solution applied over a wide range of different supply and demand scenarios. Our results suggest that the consideration of assembly capacity constraints is more vital than the consideration of intermediate material constraints in our test cases.
引用
收藏
页码:951 / 982
页数:32
相关论文
共 40 条
  • [1] Dynamic bid prices in revenue management
    Adelman, Daniel
    [J]. OPERATIONS RESEARCH, 2007, 55 (04) : 647 - 661
  • [2] Agrawal N, 1996, NAV RES LOG, V43, P839, DOI 10.1002/(SICI)1520-6750(199609)43:6<839::AID-NAV4>3.0.CO
  • [3] 2-5
  • [4] [Anonymous], [No title captured]
  • [5] Revenue management in order-driven production systems
    Barut, M
    Sridharan, V
    [J]. DECISION SCIENCES, 2005, 36 (02) : 287 - 316
  • [6] Production and inventory control of a single product assemble-to-order system with multiple customer classes
    Benjaafar, Saif
    ElHafsi, Mohsen
    [J]. MANAGEMENT SCIENCE, 2006, 52 (12) : 1896 - 1912
  • [7] Xilinx improves its semiconductor supply chain using product and process postponement
    Brown, AO
    Lee, HL
    Petrakian, R
    [J]. INTERFACES, 2000, 30 (04) : 65 - 80
  • [8] Pricing and scheduling decisions with leadtime flexibility
    Charnsirisakskul, K
    Griffin, PM
    Keskinocak, P
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 171 (01) : 153 - 169
  • [9] Quantity and due date quoting available to promise
    Chen, CY
    Zhao, ZY
    Ball, MO
    [J]. INFORMATION SYSTEMS FRONTIERS, 2001, 3 (04) : 477 - 488
  • [10] Chen CY, 2002, PROD OPER MANAG, V11, P424, DOI 10.1111/j.1937-5956.2002.tb00470.x